New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN3870 WBGS Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN3870 WBGS Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2010 1:59:06 PM
Creation date
7/2/2008 1:14:48 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
003870
GL_Project_Number
905232
Identification_Number
2005100284
COE_Contract_Number
2005-00211
Retention_Destruction_Date
11/28/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Eugene WBGS Architecture 8 Planning <br /> Amazon Park Restroom October 25, 2004 -Revised <br /> Proposal for Architectural and Ens~ineerin~ Services <br /> Consultants to submit reprodudble check sets to Architect for review <br /> and coordination at 75°~ and 95°k completion. Provide reprodudble <br /> copies at 100°~ completion. Make corrections requested by architect <br /> consistent with scope of work. <br /> Prepare a list of submittals and inspections based on specifications <br /> sections prepared by the respective consultant(s). <br /> Meetings: Meetings for this task will be part of the Owner Review Meetings listed <br /> below. <br /> Deliverables: Drawings, Specfications, Product Cut sheets, Engineering Calculations, <br /> Energy code compliance forms. Check sets of all documents for review <br /> <br /> ' by the Owner at 75°~ completion. Consultants to provide chedcset to <br /> WBGS for review at 95% completion. <br /> Assignment: As listed for Design Development task above anct, <br /> WBGS -Architectural and Interiors <br /> <br /> ! 1. Finish material and selection <br /> <br /> j 2. Architectural drawings to include mechanical, electrical, and <br /> structural information. <br /> <br /> ~ Mechanical <br /> <br /> I <br /> 1. Review architectural floor plan for items relating to heating and <br /> plumbing systems and provide darification comments. <br /> 2. Provide architect with schedules and notes supporting information <br /> <br /> ' on the floor plan. <br /> 3. Prepare energy code compliance forms for Mechanical portions of <br /> the project, and building envelope issues. <br /> Eled:rical <br /> 1. Review architectural floor plan for items relating to power and <br /> lighting systems and provide darification comments. <br /> 2. Provide architect with schedules and notes supporting information <br /> on the floor plan. <br /> 3. Site plan describing electrical requirements, induding power <br /> distribution to the building and site lighting. <br /> 4. Prepare egress and energy code compliance forms for lighting <br /> systems. <br /> <br /> i <br /> Structural <br /> 1. Design of building foundations induding subgrade. <br /> 2. Design of floor slabs <br /> 3. Entry roofs, porches, and architectural features <br /> <br /> ~ 4. Supports for maintenance equipment, mechanical, electrical, and <br /> plumbing systems. <br /> 5. Review architectural drawings for items relating to structural <br /> systems and provide clarification comments. <br /> 6. Provide architect with schedules and notes supporting information <br /> on the drawings. <br /> Note: Civil Engineering has been deleted from the proposal. <br /> <br /> i <br /> D.2 Construction Documents - Specfications <br /> Task: Specifications for Divisions 3 through 16 <br /> File: Amazon_Park_RR-Scope_of Work_Summary_2.doc Page 5 of 13 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.