New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN3870 WBGS Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN3870 WBGS Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2010 1:59:06 PM
Creation date
7/2/2008 1:14:48 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
003870
GL_Project_Number
905232
Identification_Number
2005100284
COE_Contract_Number
2005-00211
Retention_Destruction_Date
11/28/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Eugene WBGS Architecture & Planning <br /> Amazon Park Restroom October 25, 2004 -Revised <br /> Proposal for Architectural and Ens~ineorlna Services <br /> It is assumed that City of Eugene landscape staff will research and <br /> provide direction regarding land use requirements. <br /> Meetinos: None anticipated. <br /> Deliverables: Update draft code analysis for use by design team. <br /> Assignment: WBGS <br /> C.5 Cost Estimate <br /> Task: Not included. <br /> C.6 Owner Review Meetings <br /> Task: Prepare for the upcoming meetings, to coordinate project activities, to <br /> review and evaluate design activities, and to provide direction to the <br /> design team. <br /> Meetings: One meeting to review the final DD drawings, specs and product data. <br /> Deliverables: Meeting agendas, and meeting minutes. <br /> Assignment: WBGS, Owner review staff. <br /> C.7 Project Administration <br /> Task: Coordinate with Owner, coordinate with design consultants, and prepare <br /> monthly invoices. Manage meetings, deliverables, quality control, and <br /> assignments, and maintain communication. <br /> Meetings: 1 meeting(s) with WBGS design team, no meeting(s) with consultants. <br /> Deliverables: Invoices and schedules. <br /> Assignment: WBGS <br /> C.8 Fee proposal, this phase: $7,825 <br /> The remaining phases are not included in the original fee proposal, but will be included in <br /> the subsequent fee proposal. This information is included for roference only. <br /> Phase D -Construction Documents <br /> The purpose of this phase is to refined the DD work, and to prepare documents suitable for <br /> obtaining building permits, and for construction, including competitive bids for construction <br /> contracts. <br /> D.1 Construction Documents -Design and Drawings <br /> Task: Based on approved Design Development documents and budget, along <br /> with review comments, prepare construction documents suitable for bids <br /> and permit. Prepare engineering calculations. Comply with applicable <br /> codes. Communicate with other members of the design team to <br /> maintain quality control, coordination, and comply with instructions from <br /> the Owner and with prior approvals. <br /> <br /> File: Amazon_Park RR-Scope_of Work_Summary_2.doc Page 4 of 13 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.