New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN3870 WBGS Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN3870 WBGS Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2010 1:59:06 PM
Creation date
7/2/2008 1:14:48 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
003870
GL_Project_Number
905232
Identification_Number
2005100284
COE_Contract_Number
2005-00211
Retention_Destruction_Date
11/28/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Eugene WBGS Architecture & Planning <br /> Amazon Park Restroom October 25, 2004 -Revised <br /> Proposal for Architectural and Enplneerln~r Services <br /> It is our intention to include comprehensive information about the <br /> building on the architectural floor plan, including mechanical and <br /> electrical information. This should simplify the CD phase, and allow the <br /> drawing set to be used more efficiently for any future prototype <br /> applications. <br /> Meetings: See below. <br /> Deliverables: Drawings, outline specifications, and product cut sheets. <br /> Assignment: WBGS <br /> 1. Overall site plan, develop in collaboration with City of Eugene <br /> landscape staff. <br /> 2. Site Demolition <br /> 3. Sidewalks adjacent to the building <br /> 4. Provide Architectural design of buildings illustrated by: <br /> a. Floor Plan <br /> b. Ceiling Plan <br /> c. Roof Plan <br /> d. Exterior Elevations <br /> e. Building Sections <br /> f. Interior Elevations <br /> g. Room Finishes <br /> h. Doors & Windows <br /> C.3 Specifications <br /> Task: Update prototype architectural specifications, and provide redlines on <br /> Mechanical, and Electrical specifications from previous project based on <br /> refinements. Provide product cut sheets of products previously <br /> specified. <br /> <br /> ! As noted above, this building is part of a larger project lead by the City <br /> of Eugene. The specifications for the building, which will be based on <br /> the standard 16 division CSI format, will be incorporated into the project <br /> specifications, which will be based on a public works format. Divisions 3 <br /> <br /> ! (concrete) through 16 (electrical) will be prepared by the design team. <br /> The other related specification information, incuding bidding <br /> <br /> j information, and site requirements will be prepared by COE staff in the <br /> standard PW format, and reviewed by the design team for sidewalks. <br /> Meetings: See below. <br /> <br /> j Deliverables: Draft architectural specifications, comments on sections by others, and <br /> product cut sheets. <br /> Assignment: WBGS <br /> <br /> i <br /> C.4 Code Compliance <br /> Task: Comply with applicable codes. Conduct code review including building <br /> code and land use code. Note: Anew building code is in effect in <br /> Oregon as of October 1, 2004, and the prototype was developed under <br /> the previous code. Coordinate with City of Eugene PIC staff over the <br /> phone, if necessary. <br /> File: Amazon_Park RR-Scope_of Work_Summary_2.doc Page 3 of 13 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.