New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN3870 WBGS Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN3870 WBGS Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2010 1:59:06 PM
Creation date
7/2/2008 1:14:48 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
003870
GL_Project_Number
905232
Identification_Number
2005100284
COE_Contract_Number
2005-00211
Retention_Destruction_Date
11/28/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Eugene WBGS Architecture 8 Planning <br /> Amazon Park Restroom October 25, 2004 -Revised <br /> Proaosal for Archkectural and Enaineerlna Services <br /> information is provided once the first survey is received, the new information will be <br /> added to the existing survey file by the City. <br /> 3. Geotechnical report. Note, if a geotechnical report is not available, the design team will <br /> incorporate the minimum soil strength required by the building code. <br /> 4. Verification of use requirements. <br /> 5. Printing and distribution of bid documents. <br /> 6. Civil Engineering and Landscape Architecture services. <br /> 7. Building permit application <br /> Design Team <br /> Discipline Fip~r Primary Contact <br /> Architecture (A): WBGS Architecture 8 Planning PC Curt Wilson <br /> Electrical (E): Balzhiser & Hubbard Engineers Jim Krumsick <br /> Mechanical (M): Balzhiser & Hubbard Engineers Keith Hubbard <br /> Structural (S): Biggs Cardosa Engineering Scott Metzler <br /> Proposal <br /> If selected, we recommend proceeding with the project in the following phases and tasks. <br /> The fee proposal is based on an hourly not to exceed basis for the design development <br /> phase. References to other phases is for information only, and not intended to be part of the <br /> initial agreement. <br /> The following proposal is for the services described and does not include reimbursable <br /> expenses. We recommend an allocation of $250 for reimbursable expenses in addition to <br /> this proposal. <br /> Phase A -Preliminary Design <br /> Services of this phase are not included in this proposal. <br /> Phase B -Schematic Design <br /> Services of this phase are not included in this proposal. <br /> Phase C -Design Development <br /> The purpose of this phase is to refine the conceptual design and confirm the building <br /> systems. <br /> C.1 Review Prototype -This task has been deleted from the proposal. <br /> C.2 Design Development <br /> Task: Based on the prototype and comments from the Owner, prepare <br /> drawings to fully define the materials, systems, and layout of the project. <br /> Complete work to 60% complete construction documents. Comply with <br /> applicable codes (see below). Communicate with other members of the <br /> design team to maintain quality control, coordination, and comply with <br /> instructions from the owner. <br /> <br /> File: Amazon_Park_RR-Scope_of Work_Summary_2.doc Page 2 of 13 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.