• PDLK STREET WiFAIL WATER WALffY IMPROVEIAEfQTS, PRC~CT t39B4 <br /> approach, alignments, etc., must be received before the next phase of design begins. Design <br /> concepts will be frozen at that time to proceed with final design. <br /> Final (100%) Submittal <br /> Prepare one paper set of the final (100 signed construction plans, special provisions and <br /> Engineer's construction cost estimate. Final contract plans will be plotted in 11"x17" format. <br /> <br /> ~ Deliverables <br /> <br /> I <br /> CH2M HILL will provide the City with the following copies: <br /> 50~° Submittal: <br /> Plans -10 each,11x17 <br /> Draft Special Provisions -1 set <br /> Preliminary Engineer's Construction Cost Estimate -1 set <br /> 100q• Submittal: <br /> Plans -1 each, 11x17, sealed <br /> Draft Special Provisions -1 set <br /> Preliminary Engineer's Construction Cost Estimate -1 set <br /> An O&M plan -1 set <br /> Assumptions <br /> • The City will provide a survey crew to perform field topographic work and will develop <br /> the necessary base-mapping for the design drawings, to include benchmark data, inverts <br /> and other required elevation dafa, utility locations and known or potential utility <br /> confiids, needed far design. Property and right of way lines included in the design <br /> drawings will be based on the City's existing recorded data. A separate right-of-way or <br /> property survey is not included in this task. <br /> • CH7M HILL will provide survey and mapping services, if needed, should City sta#f be <br /> unavailable to complete work in a time Name necessary to meet agreed-upon schedule <br /> milestones. Anon call surveyingsub-task has been. included in the fee estimate <br /> assuming up to three crew-days of field time. A portion of tune from this task maybe <br /> used to review survey data and/or mapping provided by the City that will be used for <br /> design. <br /> + CHZM HILL will reference current City standard drawings/details in the design. Copies <br /> of these drawings/details will be appended to the specification document. <br /> • The City will insert final plans and speaal speaficatio~s into the standard boiler plate, <br /> assemble the final contract documents, and perform the bid procedure to city standards. <br /> • The City will create and provide specific traffic control plan as required. <br /> • CH2M HILL will assist the City with preparation of an Erosion Control Plan as needed. <br /> PD%IPOIK ST BA9N PLANNING AND ENGN~ERWG RNAL SbW.000 4 <br /> <br />