New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4003 Satre Assoc Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4003 Satre Assoc Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 7:55:38 PM
Creation date
6/30/2008 2:17:38 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
004003
GL_Project_Number
915046
Identification_Number
203100491
COE_Contract_Number
2003-5322
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Eugene -Delta Ponds Restoration and Recreation Project Page 3 <br /> Services Proposal: -Willamette Greenway Permit and Zone Change <br /> January 23, 2003 <br /> photos and paper and digital cop' s of planned improvements (trail, culvert and <br /> parking lot locations, pazking lot plans, sections of planned overlooks). Review with <br /> you the Greenway permit application checklist. Confirm tasks, timeline, <br /> coordination and communication for our services. <br /> 2. Complete site research activity. Obtain copies of tax lot maps, County Assessor's <br /> records, ownership deeds and legal descriptions as needed. Obtain copies of public <br /> works/public infrastructure records (for adjacent infrastructure, asapplicable). <br /> Obtain available information regazding easements, dedications, utilities, soils, <br /> significant vegetation, floodplain/floodway, wetland delineation, etc. <br /> 3. Visit, walk and photograph project site. <br /> 4. Review applicable portions of the Eugene Land Use Code, Statewide Planning <br /> Goals, Oregon Revised Statutes, Oregon Administrative Rules, the Eugene/ <br /> Springfield Metropolitan Area General Plan, Willakenzie Area Plan, TransPlan, <br /> Natural Resources Special Study, 1985 Willamette Greenway Management Proposal, <br /> 1989 Eugene Parks and Recreation Plan, Eugene Bikeways Master Plan, and other <br /> relevant plans. Outline land use approval criteria and responses to applicable <br /> planning goals and policies. <br /> 5. Prepare base map incorporating previously obtained Delta Ponds Improvements <br /> digital data. Develop preliminary Greenway Permit site plan. <br /> 6. Use previously developed data on raze plants, riparian vegetation, wetlands, and <br /> trees, as well as air photo information, and add required information to preliminary <br /> Greenway Permit site plan. Identify tree and vegetation loss, if any, and proposed <br /> vegetation enhancement azeas. <br /> 7. Incorporate all Greenway Permit application requirements into site plans (several <br /> sheets will likely be needed to convey all required information). Prepare map <br /> attachments such as existing plan maps (e.g., Willakenzie Area Plan, Metro Plan, <br /> Parks Plan, etc.) ' <br /> 8. Finalize Greenway site plans. Generate draft written project explanation and <br /> supportive facts and findings for each criterion of approval. Complete application <br /> form. <br /> <br /> 9. Generate zone change application narrative, supportive findings, and necessary <br /> attachments (we would submit the zone change as a separate but concurrent <br /> application). ~ . <br /> 10. Meet with you to review the draft Greenway Permit and zone change applications. <br /> Make revisions as directed by staff. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.