Stage 2 Roadway Improvements <br /> All improvements required with Stage 2 may not be constructed until Stage 1 <br /> improvements have been completed and are in full operation. Stage 2 work is related to <br /> Son Blaze Phase 2 and other anticipated developments as shown in Table ~3 of the Traffic <br /> Impact Analysis (included as Page 5 of this Exhibit A). Reference Drawings 2 and 3 for <br /> illustration of required improvements. <br /> • Improve Moon Mountain Drive to City of Eugene standards, from Laurel Hill Drive <br /> to Glenwood Blvd. <br /> • Reconstruct the intersection of Moon Mountain Drive, Glenwood Boulevard and <br /> Glenwood Drive as shown in Drawing 2 of Exhibit A, Page 7. The length of the turn . <br /> lanes sha11 be determined by ODOT. <br /> • Reconstruct the intersection of Glenwood Drive at the southbound exit ramp terminal <br /> as shown in Drawing 2 of Exhibit A, page 7. The length of the turn lanes shall be <br /> determined by ODOT. The design and construction will be approved by ODOT. <br /> • Extend Glenwood Boulevard south of the Moon Mountain Drive and Glenwood <br /> Drive intersection to the north property boundary of City of Eugene tax lot number <br /> TM 18 03 03, TL 200. This extension is referred to as the `Brackenfern Extension". <br /> The design and construction specifications will be approved by ODOT for the <br /> connection of the Brackenfern Extension to the Glenwood Boulevazd/Glenwood <br /> DriveJMoon Mountain Road intersection. That portion of the Brackenfern Extension <br /> outside ODOT R/W will be constructed to city street standazds. <br /> Upon completion of the Brackenferii Extension, as outlined above, and prior to <br /> opening the Brackenfern Extension to traffic operations, Moon Mountain Drive at the <br /> Glenwood Boulevazd/Glenwood Drive/Moon Mountain Drive intersection shall be <br /> restricted to one-way westbound.only operation. The design and construction will be <br /> approved by ODOT. <br /> • In conjunction with the above improvements, construct a functional roadway within <br /> the right of way of 25a' Avenue, or an approved alternative alignment, to provide two <br /> way access between Laurel Hill Drive and Brackenfern/Glenwood. At the discretion <br /> of the City of Eugene, this may include full improvement of 25a` Avenue to city <br /> standards, or a partial improvement that meets requirements for general access <br /> including emergency vehicles. <br /> <br /> • Reconstruct the intersection of Glenwood Boulevard at the northbound offramp <br /> teminal as shown in Exhibit A, Drawing 3, page 8. The length of each of the turn ' <br /> lanes wi11 be determined by ODOT. The design and construction will be approved by <br /> ODOT. <br /> EXHIBIT A PAGE 3 <br /> <br />