New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4091 PBS 06.01.05
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4091 PBS 06.01.05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2010 2:27:02 PM
Creation date
6/27/2008 10:11:22 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Project Budget Summary
PW_Active
No
External_View
No
GJN
004091
GL_Project_Number
945034
Identification_Number
Original
Retention_Destruction_Date
10/18/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Glenwood Interchange/Son Blaze Village and Surrounding <br /> Developments <br /> Required Roadway Improvements <br /> Stage 1 Roadway Improvements <br /> Stage 1 work is related to Son Blaze Phase 1 in Table 3 of the Traffic Impact Analysis 1 <br /> (included as Page 5 of Exhibit A). Reference Drawing 1 for illustration of required <br /> improvements. ~ _ <br /> Stage 1 is initial work required prior to completion of the Seal subdivision plats for Son <br /> Blaze residential phases 1, 2, 3, and 8: <br /> • The City will apply for a public road approach permit from ODOT pursuant to OAR <br /> 734-051-0014 et seq. for a road approach permit for Moon Mountain Drive. <br /> • Realign and reconstruct Moon Mountain Drive to address safety concerns and <br /> provide for the future realignment of Glenwood Drive and extension of Glenwood <br /> Blvd. (Brackenfern). <br /> • Construct aright-turn Lane for the westbound approach at the intersection of <br /> Glenwood Drive and Glenwood Boulevard. The length of the right-turn lane will be <br /> determined by ODOT. The design and construction specifications will be approved <br /> by ODOT. <br /> • Improve Laurel Hill Drive to City Standards from Moon Mountain to the souther <br /> terminus. This work will also include the improvement of the Moon Mountain and <br /> Laurel Hill intersection to conform to City Fire Marshall standards. <br /> • The contractor shall be allowed to stockpile material on-site for the future <br /> realignment of Glenwood Drive as identified in Phase 2 mitigation. The contractor <br /> shall obtain a miscellaneous permit from ODOT to perform this work. Access to the <br /> stockpile site shall be determined by ODOT. The contractor shall be responsible for <br /> preparing and implementing a traffic control plan. The traffic control plan will be <br /> approved by ODOT. ' <br /> 1 Draft Tra c Impact AnalLsis for Son Blaze Villa~nd Other Surrounding <br /> <br /> Developments dated Apri19, 2001, and amendments dated June S, 2001, prepared by <br /> <br /> JRFI Transportation Engineering. <br /> EXHIBIT A PAGE 2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.