<br /> Run Date: 08/10/2005 15:18:51 Page 5 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No 002 <br /> Contractor: 2G CONST. Original Contract: $439,927.43 <br /> Job 93-004172 Current Amount: $449,397.20 <br /> Contract No: 2005-00030 Contract Award Date: 05/27/2005 <br /> PO 2005050486 Completion Date: 10/07/2005 <br /> Assessable: Yea <br /> Current Contract Estimated Payment Cumulative Totals 9 Complete <br /> Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br /> 0530 LEVEL 2, 1/2 INCH DEN3E HMAC $6.94 3QPT 163.000 $1,131.22 595.000 $4,129.30 595.000 $4,129.30 365.00 <br /> 0540 PLAIN CONC PVMNT, UNDOWELLED, $4.01 SQF•I' 3,845.000 $15,418.45 0.000 $0.00 3,940.100 $15,799.80 102.00 <br /> 0550 CONCRETE PUMPING $0.14 SQFT 4,045.000 $566.30 0.000 $0.00 0.000 $0.00 0.00 <br /> 0560 1 1/2" 0 AGGREGATE BASE $19 79 CUYD 94.000 $1 860.26 33.000 $653.07 33.000 _ $653.07 35.00 <br /> 0570 5 INCH CONC SURFACING $4.24 SQFT 200.000 $848.00 0.000 $0.00 121.000 $513.04 61.00 <br /> 0580 4 INCH CONC WALK $3.42 SQFT 62.000 $212.04 0.000 $0.00 40.000 $136.80 65.00 <br /> 0590 TOPSOIL $4.29 SQFT 46.000 $197.34 265.000 $1,136.85 265.000 $1,136.65 576.00 <br /> 0600 TIE BARS $7.00 HACH 9.000 $63.00 0.000 $0.00 15.000 $105.00 167.00 <br /> 0610 SAW CUTTING $1.65 LINFT 324.000 $534.60 19.000 $31.35 350.000 $577.50 108.00 <br /> 0620 BARRICADE ST END TYPE B $1 577 00 LUMPSUM 1 000 $1 577 00 0 000 $0.00 0.000 $0.00 0.00 <br /> 0622 ALLEY 8&22 CONST 8" CLEANOUT 001 $8,126.65 LUMPSUM 1.000 $8,126.65 1.000 $8,126.65 1.000 $8,126.65 100.00 <br /> 0624 ALLEY BS22 CONST CONCRETE RAMP 001 $449.11 LUMPSUM 1.000 $449.11 1.000 $449.11 1.000 $449.11 100.00 <br /> Alley SO <br /> 0630 MOBILIZATION $5,258.15 LUMPSUM 1.000 $5,258.15 1.000 $5 258.15 1.000 $5 258.15 100.00 <br /> 0640 TEMP PROTECTN/DIRECTN $7,449.00 LUMPSUM 1.000 $7,449.00 1.000 $7,449.00 1.000 $7,449.00 100.00 <br /> 0650 EROSION CONTROL $303.00 LUMPSUM 1.000 $303.00 1.000 $303.00 1.000 $303.00 100.00 <br /> 0660 TREE PROTECTION FENCING $5.17 LINFT 240.000 $1,240.80 131.000 $677.27 131.000 $677.27 55.00 <br /> 0670 MINOR ADJUSTMENT OP MANHOLES $152.00 EACH 1.000 $152.00 1.000 $152.00 1.000 $152.00 100.00 <br /> 0680 MAJOR ADJUSTMENT OF CATCH BASI $849.00 EACH 1.000 $849.00 1.000 $849.00 1.000 $849.00 100.00 <br /> <br />