Run Date: OB/10/2005 15:18:51 Page 6 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Paymant No 002 <br /> Contractor: 2G CONST. Original Contract: $439,927.93 <br /> Job 93-004172 Current Amount: $449,397.20 <br /> Contract No: 2005-00030 Contract Award Date: 05/27/2005 <br /> PO 2005050486 Completion Date: 10/07/2005 <br /> Assessable: Yes <br /> Current Contract Estimated Payment Cumulative Totals b Complete <br /> Line Description Last Chng Ord Unit Pzice Unit Measure Quantity Amount Quantity Amount Quantity Amount <br /> 0690 GENERAL EXCAVATION $21.14 CUYD 166.000 $3,509.24 203.000 $4,291.42 203.000 $4,291.42 122.00 <br /> 0700 SUBGRADE STABILIZATION $13.86 CUYD 37.000 $512.82 0.000 $0.00 0.000 $0.00 0.00 <br /> 0710 SUBGRADE GEOTEXTILE $1.03 SQYD 492.000 $506.76 73.000 $75.19 73.000 $75.19 15.00 <br /> 0720 3/4 INCH 0 AGGREGATE BASE SURF $1 83 SQFT 89 000 $162 87 0.000 $0.00 0.000 $0.00 0.00 <br /> 0730 1 1/2"-0 AGGREGATB BASH $19.76 CUYD 96.000 $1,896.96 16.000 $316.16 16.000 $316.16 17.00 <br /> 0740 LEVEL 2, 1/2 INCH DENSE HMAC $5.08 SQFT 1,375.000 $6,985.00 1,298.000 $6,593.84 1,298.000 $6,593.84 94.00 <br /> 0750 PLAIN CONC PVMNT UNDOWELLED $5 50 SQPT 4 432 000 $24 376 00 4 456.000 $24 508.00 4 456.000 $24,508.00 101.00 <br /> 0760 CONCRETE PUMPING $0.15 SQPT 4,432.000 $664.80 0.000 $0.00 0.000 $0.00 0.00 <br /> 0770 TOPSOIL $4.29 SQFT 134.000 $574.86 282.000 51,209.78 282.000 $1,209.78 210.00 <br /> 0780 9ANCUTTINO $1.65 LINFT 460.000 $759.00 631.000 $1,041.15 631.000 $1,091.15 137.00 <br /> <br /> iii a;ca <br /> 0782 ALLEY 10 STANDBY FOR UTILITY C 001 $305.05 LUMPSUM 1.000 $305.05 1.000 $305.05 1.000 $305.05 100.00 <br /> Alley 16 <br /> 0790 MOBILIZATION $5,621.44 LUMPSUM 1.000 $5,621.44 0.000 $0.00 1.000 $5,621.44 100.00 <br /> 0800 TEMP PROTECTN/DIRECTN $7 836 00 LUMPSUM 1 000 $7 836.00 0.000 $0.00 1.000 $7,836.00 _100.00 <br /> 0810 EROSION CONTROL $303.00 LUMPSUM 1.000 $303.00 0.000 $0.00 1.000 $303.00 100.00 <br /> 0820 TREE PROTECTION FENCING $5.17 LINFT 80.000 $413.60 0.000 $0.00 0.000 $0.00 0.00 <br /> 0830 10 DRAIN PIPE $35 O1 LINFT 50.000 $1 750.50 0.000 $0.00 50.400 $1,764.50 101.00 <br /> 0840 CATCH BASINS $1,285.00 EACH 3.000 $3,855.00 0.000 $0.00 3.000 $3,855.00 100.00 <br /> 0850 CONNECTION TO EXISTING PIPES ( $607.00 EACH 1.000 $607.00 0.000 $0.00 1.000 $607.00 100.00 <br /> <br />