New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4172 2G PMT 2
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4172 2G PMT 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2010 2:31:35 PM
Creation date
6/25/2008 11:46:14 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Invoices-Payments & Receivables
PW_Active
No
External_View
No
GJN
004172
GL_Project_Number
955064
Identification_Number
2005100486
COE_Contract_Number
2005-00030
Retention_Destruction_Date
10/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br /> <br /> Run Date: 08/10/2005 15:18:51 Page 4 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No : 002 <br /> Contractor: 2G CONST. Original Contract: $439,927.43 <br /> Job 93-004172 Current Amount: $449,397.20 <br /> Contract No: 2005-00030 Contract Award Date: 05/27/2005 <br /> PO 2005050486 Completion Date: 10/07/2005 <br /> Assessable: Yes <br /> Current Contract Estimated Payment Cumulative Totals 9 Complete <br /> Line Description Last Chug Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br /> 0340 SUBGRADE GEOTEXTILE $1.03 SQYD 728.000 $749.84 156.000 $160.68 156.000 $160.68 21.00 <br /> 0350 3/4 INCH 0 AGGREGATE BASE SURF $3 71 SQFT 89 000 $330 19 0 000 $0.00 0.000 $0.00 0.00 <br /> 0360 1 1/2"-0 AGGREGATE HASE $19.21 CUYD 141.000 $2,708.61 45.000 $864.45 45.000 $864.45 32.00 <br /> 0370 LEVEL 2, 1/2 INCH DENSE HMAC $2.28 SQPT 1,534.000 $3,497.52 0.000 $0.00 0.000 $0.00 0.00 <br /> 0380 PLAIN CONC PVMNT UNDOWELLED $5 49 SQFT 6 555 000 $35 986.95 0.000 $0.00 0.000 _ $0.00 0.00 <br /> 0390 CONCRETE PUMPING $0.13 SQFT 6,555.000 $852.15 0.000 $0.00 0.000 $0.00 0.00 <br /> 0400 TOPSOIL $4.29 SQFT 162.000 $694.98 0.000 $0.00 0.000 $0.00 0.00 <br /> 0410 SAW CUTTING $1 65 LINFT 730 000 $1 204 50 390.000 $643.50 390.000 $643.50 53.00 <br /> Alleys 8 4 22 <br /> 0420 MOBILIZATION $4,086.52 LUMPSUM 1.000 $4,086.52 0.000 $0.00 1.000 $4,086.52 100.00 <br /> 0430 TEMP PROTECTN/DIRECTN $8,386.00 LUMPSUM 1.000 $8,386.00 0.000 ~ $0.00 1.000 $8,386.00 100.00 <br /> 0440 TRSS PROTSCTION FENCING $5.17 LiNPT 30.000 $155.10 0.000 $0.00 103.000 $532.51 393.00 <br /> 0450 EROSZON CONTROL $303.00 LUMPSUM 1.000 $303.00 0.000 $0.00 1.000 $303.00 100.00 <br /> 0460 10" DRAIN PIPE $32.11 LINFT 25.000 $802.75 0.000 $0.00 25.000 $802.75 100.00 <br /> 0470 CATCH BASINS $825.00 EACH 2.000 $1,650.00 0.000 $0.00 2.000 $1,650.00 100.00 <br /> 0.00 <br /> 64.00 0.000 0.00 0.000 $0.00 <br /> 1.000 9 $ <br /> 0480 CURB INLETS, TYPE 4A $964.00 EACH $ <br /> 0490 GENERAL EXCAVATION $20.57 CUYD 135.000 $2,776.95 0.000 $0.00 158.000 $3,250.06 117.00 <br /> 0500 SUBGRADE STABILIZATION $11.44 CUYD 71.000 $612.24 0.000 $0.00 33.000 $377.52 46.00 <br /> 0510 SUBGRADE GEOTEXTZLE $1.03 SQYD 428.000 $440.84 0.000 $0.00 147.000 $151.41 34.00 <br /> 0520 3/4 INCH-0 AGGRSGATB BASH SURF $0.70 SQFT 164.000 $114.80 221.000 $154.70 221.000 $154.70 135.00 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.