New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4172 Balzhiser & Hubbard Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4172 Balzhiser & Hubbard Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2010 2:31:36 PM
Creation date
6/25/2008 11:42:02 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004172
GL_Project_Number
955064
Identification_Number
2004100515
COE_Contract_Number
2005-00220
Retention_Destruction_Date
10/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
' --Pages-- <br /> ? Reproduce and submit documents to utility companies for concurrence. Obtain concurrences and <br /> forward to City. <br /> ? Provide original documents to City for reproduction and distribution to utility companies and <br /> bidders. <br /> <br /> Bidding Period Services <br /> ? Coordination with City. <br /> ? Attend pre-bid meeting (assumes attendance at no more than two pre-bid meetings with one <br /> attendee). <br /> ? Respond to bidder inquiries, as requested by City. <br /> ? Assist in issuing addenda items to the City for inclusion with City's addenda, as requested by City. <br /> Construction Period Services <br /> ? Coordination with City. <br /> ? Attend pre-construction meeting (assumes attendance at no more than two pre-construction meetings <br /> with one attendee). <br /> ? Provide construction staking. <br /> ? We will provide one set of rough grade stakes and one set of finish grade stakes for the <br /> concrete alley. <br /> ? We anticipate that each alley will require one catch basin and a minimal amount of storm drain <br /> to connect to the existing system and will provide one set of stakes for the construction of the <br /> storm line and one set of stakes for the location and setting of the catch basin. <br /> ? Respond to contractor inquiries, as requested by City. <br /> ? Assist in issuing change directives and change orders for issuance by the City, as requested by City <br /> ? Provide daily site inspection services for each alley project, arrange for construction materials <br /> sampling and testing, provide inspection notes, and provide project certification. (Our proposal is <br /> based on a total of I S working days of construction per alley with 3 hours per day of inspection per <br /> alley.) <br /> ? Provide as-built survey. <br /> ? We will provide the field work and data reduction necessary to provide grade and alignment <br /> information for the alleyway and drainage improvements. <br /> ? We will provide as-constructed information to the engineer in the form of drawing files, ASCI <br /> point files and copies of field notes. <br /> ? Provide as-built documents. <br /> ? Provide City with as-built drawings, calculations, and other record documents. <br /> ? Provide as-built drawings to the City in electronic forma <br /> Assumptions <br /> ? The City will prepare the Special Provisions, assemble the packages, advertise the project for bid, <br /> reproduce documents and issue documents to bidders, plan centers and utility companies, and <br /> administer plan holder deposits. <br /> ? The City will administer the construction contracts. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.