<br /> . 5 of 7 <br /> AIRPORT Eu ene Ai ort -Parallel DATE 5/30/06 <br /> ' Runwa Pro'ect <br /> LOCATION Eugene, Oregon AIP PROJECT NO. 3-41-0018-35 <br /> Jab No. 4183 <br /> Chan a Order 16 <br /> CONTRACTOR Wildish Construction Co. <br /> JUSTIFICATION FOR CHANGE <br /> 2.. Reason(s) for the change(s) (Continue on reverse if necessary) <br /> 2840 - Mod cations to isolation transformers in new and eristing signs <br /> The transformers in these 28 new signs must be replaced prior to recircuiting to avoid over driving the sign lamps, causing <br /> premature lamp Failure. After recircuiting is complete, the new signs will be fed from the new electrical vault and the <br /> ratio style transformers will be reinstalled to allow the entire dedicated sign circuit to comply with FAA standards. <br /> Replacing the non-isolation transformers with ratio style transformers in the 59 existing signs will provide proper Light <br /> output using an FAA standard regulator output of 5.5 amps. <br /> 2850 - Rocksaw rental <br /> A rocksaw was required to cut a trench through existing cement treated base adjacent to the intersection of Taxiways Papa <br /> and Delta. The plans did not indicate to the contractor that they would encounter cement treated base after the asphalt was <br /> removed by milling. It was determined that cutting a trench for the edge lights ducts and lights would do the least damage <br /> to the pavement base and that it should be a project cost, not the contractor's responsibility. <br /> 2860 - Install eztender board for generator <br /> The extender board is necessary to monitor the operation of the new generator and provide alarms to the airport lighting <br /> control system (ALCS) as required so that corrective action can be taken in a timely manner. This communication board <br /> and related wiring were not included in the original contract. <br /> 2870 - Radio controller modifications <br /> The radio controller will enhance safety and conserve energy by allowing pilots to increase the intensity of the runway <br /> edge lights after the air traffic control tower (ATCT) is closed. After 15 minutes, the intensity will be automatically <br /> reduced to a lower level, consuming less electricity. In addition, the antenna was relocated from the original location on <br /> the vault building to the higher SRE 1 building, providing a clear line of site to each normal glide path. <br /> 2880 - Install cages around two ezterior conduits at the electrical building <br /> The cages will protect the PVC pipe and the lighting protection system from potential damage by vehicular traffic. This <br /> work was not included in the original contract documents. <br /> 2890 - Sill plates at doors in electrical building <br /> The new sill plates will provide a more durable surface for travel in and out of the building by the new Course Hinds <br /> forklift, which was not anticipated during design. <br /> 2900 - Clean agent fire extinguishers in electrical building <br /> The original fire extinguishers were replaced with clean agent fire extinguishers because they can extinguish fires without <br /> damaging the expensive electrical equipment in the electrical building. <br /> 2910 -Wind cone approach roads on Runway 16R/34L <br /> The new roads will provide airport operations with hard surface road access to the supplemental windcones, preventing the <br /> tracking of mud on the runway. <br /> 5 <br /> <br />