New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4183 CO17
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4183 CO17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2008 4:51:26 PM
Creation date
6/25/2008 10:53:02 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
004183
GL_Project_Number
945202
Identification_Number
2004100581
COE_Contract_Number
2004-00024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 4 of 7 <br /> AIRPORT ~ Eu ene Ai ort -Parallel DATE . 5/30/06 <br /> ' Runwa Pro'ect <br /> LOCATION Eugene, Oregon AIP PROJECT NO. 3-41-0018-35 <br /> Job No. 4183 <br /> CONTRACTOR Wildish Construction Co. Chan a Order 16 <br /> <br /> JUSTIFICATION FOR CHANGE <br /> <br /> 1 Brief description of the proposed contract chang~sZand location(sl. <br /> 2910 -Wind cone approach roads on Runway 16R/34L <br /> Construct new paved approach roads for the two supplemental windoones on Runway 16R/34L. <br /> 2920 -Raise electrical vaults <br /> The lids of two new electrical vaults at the Hollis Lane crossing north of Taxiway Charlie need to be raised one foot. The <br /> existing buried electrical vault that is located 400-feet north of Taxiway Gulf on Taxiway Delta needs to be raised 6- <br /> inches. <br /> 2930 -Add sign switches <br /> Add external on-off switches to 85 new signs throughout the project to provide a safe method to allow relamping of a sign <br /> while the circuit is energized. <br /> 2940 - Regrade service roads in safety area <br /> The shoulders of the new service roads in the safety area of Runways 16L and 34R will be filled and re-graded. <br /> 2450 -Additional grading around inlets on abandoned Runway 3/21 <br /> Excess material from onsite excavation will be used to fill and grade the area around the existing inlets on the edges of <br /> abandoned Runway 3/21. <br /> 2960 - Over~eacavation on Tay M <br /> Remove unsuitable subgrade from station 6+00 to station 9+00 on Taxiway M, proof roll the area, and import bar run <br /> material as required to re-establish the original subgrade elevation. <br /> 2970 -Grade around basins at EGAR <br /> Regrade the basins associated with relocating catch basins W 19 and W 17. Excess material from onsite excavation will be <br /> used to fill and grade the basins around both of these catch basins. <br /> 2980 -Paint additional Xs on the ends of Try B and Rwy 16L/34R <br /> Four new yellow Xs, Z each on the ends of Taxiway B and Runway 16L/34R, were added to improve safety'and more <br /> clearly indicate the new pavement was not available for aircraft traffic during construction. <br /> 2990 -Install drain around fueling tank facility <br /> Install a new trench drain system around the new generator fueling tank facility located adjacent to the SRE2 building. <br /> This drain system consists of 6-inch perforated pipe in drain rock, with alight-line connection to an existing storm drain <br /> pipe. <br /> 4 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.