New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4183 CO15
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4183 CO15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2008 4:51:37 PM
Creation date
6/25/2008 10:51:54 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
004183
GL_Project_Number
945202
Identification_Number
2004100581
COE_Contract_Number
2004-00024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AIRPORT Eu ere Ai ort -Parallel DATE 11/29/05 <br /> Runwa Pro'ect <br /> LOCATION Eugene, Oregon AIP PROJECT NO. 3-41-0018-35 <br /> Job No. 4183 <br /> CONTRACTOR Wildish Construction Co. Chan a Order 14 <br /> JUSTIFICATION FOR CHANGE <br /> 2.. Reason(s) for the change(s) (Continue on reverse if necessary) <br /> 2600 -Place concrete slabs around inlets on abandoned Rwy 3/21 west of Rwy 16R/34L <br /> This area containing the inlet manholes will be leased out for farming in the near future. The concrete slabs were added to <br /> protect the inlet manholes and allow access to maintain the existing storm system. This work was not in the original <br /> project documents. <br /> 2610 -Purchase and place two additional vinyl Xs and paint closure crosses <br /> All available virryl Xs owned by the airport were being used for the closure of the future Rwy 16L/34R These additional <br /> Xs were added to Rwy 3/21 to meet the requirements for closing a runway on a permanent basis. <br /> 2620 -Plant new trees at Fiddler's Green Golf Course <br /> New trees will be planted to replace the trees that were removed because they were obstructions. <br /> 2630 - Additional cost of lighting modifications at Fiddler's Green Golf Course <br /> After the new lights were installed under bid item 2470, it was necessary to make some minor adjustments to the vertical <br /> and horizontal angle of the lights and then to check the results by flying the approach to Rwy 16L. The final adjustment <br /> of the lights is included under this item. <br /> 2640 - Stump removal at Fiddler's Green Golf Course <br /> With the removal of four trees that were obstructions to the approach surface of Rwy 16L, the stumps in the fairway are a <br /> safety hazard to golfers as well as an aesthetic problem for the golf course, so they need to be removed. <br /> 2650 -Fence repair on airport property south of Rwy 161:J34R <br /> <br /> The existing livestock fence was damaged during obstruction tree removal, which made these repairs necessary. <br /> 6 of 7 <br /> s <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.