Page 9 of 10 <br /> EV-04 Details <br /> Category Item Qty (Units) Rate Extended <br /> <br /> Labor. Labor 0.25 Hours 336.37 310.67 <br /> <br /> Material: Concrete 0.44 CqY 681.00 326.84 <br /> Rentals: Concrete 0.44 per CuY 320.83 39.17 <br /> Total: 548.87 <br /> Width LenSth Depth Cubic Yarns <br /> Volume: 8.33 22.5 0.08 0.44 <br /> 9 <br /> <br />