New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4183 CO 6
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4183 CO 6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2008 4:50:46 PM
Creation date
6/25/2008 10:46:06 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
004183
GL_Project_Number
945202
Identification_Number
2004100581
COE_Contract_Number
2004-00024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> " Page 8 of 10 ' <br /> C HANG ~ O R D T R <br /> aildiah Job # 3237 <br /> City of Eugene Job # 4183 <br /> CHANGE ORDER: EV-04 <br /> PROJECT: Airpozt Runway <br /> Elect Vault Bldq <br /> The following changes are proposed: <br /> Reference Owner/Proj. Change Order 2 <br /> The revised drawing V13 thickens the floor slab to a <br /> section of the regulator room to S" thick with #4 <br /> • rebar at 9" on center. <br /> Labor and N~terials: $ 4 6.67 <br /> Total Add/(Deduct) Costs This Change Order: 546.67 <br /> Total Above ~ ~ 546.67 <br /> Overhead & Profit (15~) 57.00 <br /> Proposed Change Order Cost_ 553.67 <br /> Recommended by ~,,,;.,..'~e~.~•---- <br /> Tim Bonn, Project Engineer Date : 9/,~Aib y <br /> 8 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.