<br /> ' Page 7 of 10 <br /> CHAN6I~ ORDER <br /> ~ildiah Job # 3237 <br /> City of Eugane Job # 4183 <br /> CHANGE ORDER: EV-03 <br /> PROJECT: Airport Runway <br /> Elect Vault Bldg <br /> The following changes are proposed: <br /> Reference Owner/Prod. Change Order 2 <br /> The revised drawing V2 adds a fire extinguisher, <br /> details as per note 14. <br /> Fire extinguisher (2A 20BC): $50.00 <br /> Labor (1 hour) $ 4 4.00 <br /> Total Add/(Deduct} Costs This Change Order: $94.00 <br /> Total Above $94.00 <br /> Overhead & Profit (15$} $14.10 <br /> Proposed Change Order Cost $108.10 <br /> Recommended by <br /> Tim Bonn, Project Engineer Date : g1~P10•/ <br /> 7 <br /> <br />