New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4183 CO 6
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4183 CO 6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2008 4:50:46 PM
Creation date
6/25/2008 10:46:06 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
004183
GL_Project_Number
945202
Identification_Number
2004100581
COE_Contract_Number
2004-00024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> ' ~ Page6of10 <br /> CHANGE ORDJ~R <br /> Wildiah Job # 3237 <br /> City of Eugene Job # 4183 <br /> CHANGE ORDER: EV-02 <br /> PROJECT: Airport Runway <br /> Elect Vault Hldg <br /> The following changes are proposed: <br /> Reference Owner/Proj. Change Order Field regt by Mead & Hunt <br /> During field walk, Mead & Hunt directed the <br /> relocation of electrical meters and CT cans to the <br /> East wall, and to smooth block to that section of <br /> wall. <br /> Paddock Masonry: $ 3 8 8.61 <br /> Total Add/(Deduct> Costs This Change Order: 5388.61 <br /> Total Above $388.61 <br /> Overhead & Profit (15~? $58.29 <br /> Proposed Change Order Cost ~ $446.90 <br /> Recommended by <br /> Tim Bonn, Project Engineer Date : 9/2p/oy <br /> 6 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.