Page 5 of 10 <br /> EV-01 Details <br /> Cabgory fleet Qty (Units) Rabe Extended <br /> Labor: Laborer, straight 20 Hours x36.37 x727.40 <br /> Laborer, Overtime 1 Hours 354.56 354.56 <br /> Carpenter 17 Hours 344.00 3748.00 <br /> Material: Insulation 26 Sheets 311.99 33i 1.74 <br /> Pr+otedion Board 52 Sheets $12.00 3624.00 <br /> Flashing 1 Lump 51,045.00 31,045.00 <br /> ~entais: Back Hoe 16 Hours 325.00 3400.00 <br /> <br /> Subs: Paddock 1 Lump 3584.48 3564.48 <br /> Total: 34,475.18 <br /> 5 <br /> <br />