New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4183 CO 6
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4183 CO 6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2008 4:50:46 PM
Creation date
6/25/2008 10:46:06 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
004183
GL_Project_Number
945202
Identification_Number
2004100581
COE_Contract_Number
2004-00024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 4 of 10 <br /> C$ A N G L O R D E R <br /> Wildiah Job # 3237 <br /> City of Eugene Job # 4183 <br /> CHANGE ORDER: EV'01 <br /> PROJECT : .Airport Runway <br /> Elect Vault Bldg <br /> <br /> The following changes are proposed: <br /> Reference Owner/Project Change Order 2 <br /> Drawing V9 has block modifications to receive <br /> flashing that requires added insulation, protection <br /> board and flashing. <br /> Als Sheet Metei; Fabricate 26 gauge SS foundation flashing and comer <br /> cps' $1, 045.00 <br /> Paddock Masonry; Addition of block: $ 5 64.4 8 <br /> Insulation: $ 311.7 4 <br /> Protection Board: $ 6 2 4.0 0 <br /> Labor. $1, 52 9.96 <br /> Rerttais: $ 4 00.00 <br /> Total Add/(Deduct) Costs This Change Order: $4,475.18 <br /> Total Above $4,475.18 <br /> Overhead & Profit (15$) ~ $671.28 <br /> Proposed Change Order Cost $5,146.46 <br /> m............... <br /> Recommended b~ <br /> Tim Bonn, Project Engineer Date : 9/.2P/D`/ <br /> 4 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.