<br /> Each Phase of the Project wilt have a con-
<br /> struction schedule and liquidated damages
<br /> will be charged at a rate of $1000 per calen-
<br /> dar day should the contractor fail to complete
<br /> the work within the time limits specified.
<br /> There is a special liquidated damages of
<br /> $10,000 per calendar day for reopening Run-
<br /> way 16R/34L within 5 days of closing.
<br /> PRE-BID MEETING: All interested parties
<br /> are invited to attend apre-bid meeting to be
<br /> held on May 11, 2004, at 10:00 a.m. at the
<br /> Eugene Airport, Administration Building,
<br /> 28855 Lockheed Drive, Eugene, OR 97402
<br /> BID SECURITY: Bidder shall submit a Bid
<br /> Bond, Certified Check, Cashier's Check,
<br /> Savings & Loan Secured Check, or irrevoca-
<br /> ble Letter of Credit issued by a financial insti-
<br /> tution for ten percefit (10%) of the Base Bid
<br /> and Additive Alternatives, 'rf any.
<br /> CONSTRUCTION DOCUMENTS: Draw-
<br /> ings and Specifications, including Bidding
<br /> Documents and Agreement may be exam-
<br /> ined at the following locations:
<br /> Builder's Exchange Washington, Everett,
<br /> WA 425-258-1303
<br /> Central Oregon Builder's Exchange, Bend,
<br /> OR, 541-389-0123
<br /> ' _ Construction Data and News Westside "
<br /> Plan Center, Portland, OR, 503-225-0200
<br /> Construction Market Data, Portland, OR,
<br /> _ 503-225-1857
<br /> Daily Journal of Commerce Plan Center,
<br /> Portland, OR, 503-274-0624
<br /> Douglas County Plan Center, Roseburg
<br /> OR, 541-440-9030
<br /> Eugene Builders Exchange, Eugene, OR,
<br /> 541-484-5331
<br /> FW Dodge Plan Room, Eugene, OR
<br /> 541-687-1078
<br /> Oregon " Contractor Plan Center,
<br /> ;Clackamas, OR, 503-650-0148
<br /> i Reed Construction Data, Portland, OR
<br /> 503-255-1857
<br /> Salem Contractors Exchange, Salem OR,
<br /> 503-362-7957
<br /> • Willamette Valley Bjd Center; Tangent,
<br /> OR, 541-928-5159
<br /> Snohomish County Plan Center, Everett,
<br /> WA, 425-258-1303
<br /> Valley Plan Center, -Kent WA,
<br /> 253-852-1090
<br /> Prime Bidders may obtain bidding docu-
<br /> meats by phone at (541) 682-5560 or in per-
<br /> son from the City of Eugene upon payment
<br /> of anon-refundable fee of $65.00 plus $8.50
<br /> postage.
<br /> For any questions regarding this project
<br /> please call Bill Ness with Mead & Hunt, Inc at
<br /> (541) 689-9997, or use our Engineering Bid
<br /> Website www.ci.eugene.or.us/PW/Engineer
<br /> ingrBids to review Plans and Specifications.
<br /> NON-RESIDENT BIDDERS: In accordance
<br /> with ORS 279.029, Bidders will be required
<br /> " ~ to indicate on the Bid Form whether or not
<br /> the Bidder is an Oregon resident.
<br /> CONTRACTOR'S REGISTRATION: Bids
<br /> ~ will not be considered,.unless ttie Bidder is
<br /> registered with the Construction Contractors
<br /> )
<br /> s Board as required by ORS 701.005.
<br /> ~ ~ WAGE RATES: Contractor is subjectto the
<br /> Davis-Bacon Act (4fJ U.S.C.276a). No bid will
<br /> > be received or considered unless the bid
<br /> contains a statement by the bidder that provi-
<br /> sions of 40 U.S.C.276a shall be complied
<br /> with.
<br /> DISCLOSURE OF FIRST-TIER SUBCON-
<br /> TRACTORS Bidders shall submit, with all bid
<br /> proposal documents prior to the bid cosing
<br /> date and time, a list of First-Trer Subcontrec-
<br /> ' tors as defined in ORS 279.027. For this
<br /> project, the First-Tier subcontractor Disclo-
<br /> sure Statement must be submitted
<br /> regardless of the bid amount.
<br /> - ASBESTOS ABATEMENT: Asbestos _
<br /> abatement work is not anticipated on this
<br /> Project. If such work is required, Contractors
<br /> shall comply with ORS 279.350.
<br /> ' EMPLOYEE DRUG TESTING PROGRAM:
<br /> Pursuant to ORS 279.312(2), ail contractors
<br /> and subcontractors working on public im-
<br /> provement contracts shall demonstrate that
<br /> an employee drug testing program is in
<br /> place. A cert'rficate of Bidder/Contractor of
<br /> Employee Drug Testing Policy shall be sub-
<br /> mitted with the bid.
<br /> The proposed contract is subject to the fol-
<br />
<br /> i, lowing regulations:
<br /> 1. The proposed contract is under and sub-
<br /> ject to Executive Order 11245 of September
<br /> 24, 1986, and to the Equal Employment Op-
<br /> portunity (EEO) and Federal Labor
<br /> Provisions.
<br /> 2. All tabor on the project shall be paid no
<br /> less than the minimum wage rates estab-
<br /> lished by the U.S. Secretary of Labor.
<br /> 3. Each Bidder must suppy all information -
<br /> required by the bid documents and specrfica-
<br />
<br />
|