1 ~ <br /> Steve Gallup, City of Eugene <br /> Load Rating Letter Proposal C O N S U l I/ N s <br /> September 19, 2003 ~ f NG 1 N f f AS <br /> Page 2 of 2 <br /> Following review of the letter report, OBEC will meet with the City to discuss the options <br /> available for repair of these bridges. This will include discussions about the need for emergency <br /> repairs and how the City might approach longer term repair options. Additional engineering <br /> budget for design and inspection work will be developed based on those discussions. We hope <br /> that we have provided you with the information you require at this time. If this proposal meets <br /> with your approval, please sign the concurrence at the bottom of this letter. <br /> Sincerely, <br /> Gayle D. Harley, P.E. <br /> President & Chief Construction Engineer <br /> GDH/mlh <br /> Enclosures <br /> 9' Z3 <br /> City of Eugene Date <br /> <br /> ~r <br /> <br />