y, <br /> f <br /> Inspection & Load Rating Concrete Spans EXHIBIT A September 19, 2003 <br /> Ferry St. Bridge & Viaduct ESTIMATED COST <br /> OBEC Consultin En ineers <br /> Proj Mgr / SUBTASK TOTAL <br /> TASK Principal Proj Team Proj Engr Sr. Eng. Tech Eng. Tech 1 Clerical TOTAL HOURS <br /> Leader <br /> TASK 1 CRACK MAPPING <br /> 1.1 Inspect Bridge No. 40056 (FSB Viaduct) 1 8 8 17 <br /> 1.2 Crack Report 1 2 3 <br /> Task Subtotal 2 0 0 10 8 0 20 <br /> TASK 2 LOAD RATINGS (Concrete Only) <br /> 2.1 Bridge No. 06648 (FSB) 1 2 16 19 <br /> 2.2 Bridge No. 40056 (FSB Viaduct) 1 2 24 1 28 <br /> Task Subtotal 2 4 40 0 0 1 47 <br /> TASK 3 RECOMMENDATIONS <br /> 3.1 Letter Report 8 2 2 12 <br /> 3.2 Meetings 3 2 2 0 0 0 7 <br /> Task Subtotal 11 4 4 0 0 0 19 <br /> 0 <br /> Task Subtotal 0 0 0 0 0 0 0 <br /> 0 <br /> TOTAL HOURS 15 8 44 10 8 1 86 <br /> AVERAGE HOURLY RATES $130.00 $118.00 $90.00 $90.00 $55.00 $49.00 <br /> TOTAL LABOR ESTIMATE $1,950 $944 $3,960 $900 $440 $49 $8,243 <br /> MISCELLANEOUS EXPENSES $575 <br /> EXPENSES TOTAL OBEC PROJECT ESTIMATE $8,818 <br /> Mileage $25 <br /> Boom Lift Rental $500 <br /> Misc. Office Expenses $50 Total NOt To EXCeed $8,900 <br /> <br /> I <br /> <br />