Run Date: 08/01/2005 10:51:33 ~ <br /> City of Eugene <br /> Engineer's Estimate <br /> Estimate: Estimate <br /> Job 93-004250 W 1ST AVE STM PIPE - SENECA/gg <br /> Line No. Description Quantity Onit Unit Price Amount <br /> W 1ST AVE 3TM PIPE - SENECA/99 <br /> General <br /> 0010. MOBILIZATION 1.00 LUMPSUM $10,339.00 <br /> 0020. 12 INCH C19 CL3 CCP PIPE $10,339.00 <br /> 0030. 24 INCH RCCP PIPE 133.00 LINFT $20.00 $2,660.00 <br /> 0040. 30 INCH RCCP PIPE 68.00 LINFT $30.00 $2,090.00 <br /> 0050. 36 INCH RCCP PIPE 10.00 LINFT $92.00 $420.00 <br /> 0060. CONCRETE STORM DRAIN MANHOLES 1,460.00 LINFT $50.00 $73,000.00 <br /> 0070. CONCRETE MANHOLE, FLAT TOP W/CG3 2.00 EACH $2,500.00 $5,000.00 <br /> 0080. 36" TRASH RACK 5.00 EACH $2,500.00 $12,500.00 <br /> 0090. CONNECTION TO EXISTING STRUCTURES 1.00 EACH $600.00 $600.00 <br /> 0100. RR UNDER-CROSSING 1.00 EACH $800.00 $800.00 <br /> O11D. 1" MINUS CRUSHED ROCR 2.00 EACH $2,000.00 $4,000.00 <br /> 0120. TV PIPE INSPECTION 10.00 CUYD $50.00 $500.00 <br /> Total General 1,700.00 FOOT $1.10 $1,870.00 <br /> Total W 1ST AVE STM PIPE - SENECA/99 $113,729.00 <br /> $113,729.00 <br /> Total Estimate <br /> $113,729.00 <br /> <br /> M <br /> <br />