New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4250 PBS 08.12.05
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4250 PBS 08.12.05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2010 11:16:42 AM
Creation date
6/23/2008 9:08:15 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Project Budget Summary
PW_Active
No
External_View
No
GJN
004250
GL_Project_Number
955106
Identification_Number
Revised
Retention_Destruction_Date
7/1/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~~Run Dace: 08/01/2005 10:96:96 ~ <br /> City of Eugene <br /> Estimate Distribution ~~~/Q~ <br /> Estimate: Post Bid Estimate <br /> Job 93-004250 W 1ST AVE STM PIPE - 38NECA/99 <br /> Line No. Description <br /> Quantity Unit Unit Price Amount <br /> W 1ST AVE STM PIPE - ggNg~gg <br /> General <br /> 0010. MOBILIZATION <br /> 0020. 12 INCH C19 CL3 CCP PIPE 1.00 LOMPSOM $31,500.00 $31,500.00 <br /> 0030. 24 INCH RCCP PIPE 133.00 LINFT $93.00 $5,719.00 <br /> 0090. 30 INCH RCCP PIPE 68.00 LINE'T $59.00 $4,012.00 <br /> 0050. 36 INCH RCCP PIPE 10.00 LINFT $80.00 $800.00 <br /> 0060. CONCRETE STORM DRAIN MANHOLES 1,960.00 LINFT $77.00 $112,420.00 <br /> 0070. CONCRETE MANHOLE, FLAT TOP W/CG3 2'00 EACH $3,600.00 $7,200.00 <br /> 0060. 36" TRASH RACK 5.00 EACH $9,000.00 $20,000.00 <br /> 0090. CONNECTION TO EXISTING STRUCTURES 1.00 EACH $600.00 $600.00 <br /> 0100. RR UNDER-CROSSING 1.00 EACH $500.00 $500.OD <br /> 0110. 1" MINUS CRUSHED ROCK 2.0o EACH $150.00 $300.00 <br /> 0120. TV PIPE INSPECTION 10.00 CUYD $20.00 $200.00 <br /> Total General 1,700.00 FOOT $1.00 $1,700.00 <br /> Total W 13T AVE 3TM PIPE - SSNECA/99 $184,951.00 <br /> $184,951.00 <br /> W 13T AVE STM PIPE - 3ENECA/g9 - Other / Direct <br /> General <br /> 0010. test 26 of Contract ,~,p ~ <br /> 0020. Contingency 10~ of Contract <br /> Total : General $18, <br /> Total W 1ST AVE STM PIPE - 3ENECA/99 - Other / Direct $22,194.12 <br /> $22,194.12 LS~~ <br /> W 1ST AVE STM PIPE - 38L~CA/99 - Miscellaaeous <br /> General <br /> 0010. Engineering Charge 27~ of Direct <br /> Total General $55,929.18 a G <br /> Total W 1ST AVE STM PIPE - gg,NE~99 _ Miecellaneove $55,929.18 ~ <br /> $55,929.18 <br /> Total Post Bid Estimate <br /> $263,074.30 ?,~2 <br /> <br /> a <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.