>:ugene-4-01 Proposal Cost Breakdown Supplemental Shep* <br /> <br /> ~r Cumulative <br /> Quantity Units Rate Subtotals Total <br /> 03 N. Danebo Ave. from Roosevelt Blvd. to W. 11 th Ave. 2,520 feet Cores 4 <br /> On Siie FWD testing and Coring FWD 50 <br /> FWD Unii (includes staff engineer) 0.5 each S 1,500.00 S 750.00 <br /> Staff Engineer III (core logging) 4.5 hours S 97.00 S 436.50 <br /> Flagging Subcontractor 1 each S 540.00 S 540.00 <br /> Drilling Subcontractor i each S 1,500.00 S 1,500.00 <br /> Data Reduction and Analysis <br /> Project Engineer 5 hours S 107.00 S 535.00 <br /> Laboratory Testing <br /> Moisture Content 6 each S 15.00 S 90.00 <br /> Wash Sieve Analysis 1 each S 80.00 S 80.00 <br /> Atterberg Limits 1 each S 105.00 S 105.00 <br /> Report Preparation <br /> Principal Engineer (review) 1 hour S 140.00 S 140.00 <br /> Project Engineer S hours S 107.00 S 535.00 <br /> Drafting 1.5 hours S 78.00 S 117.00 <br /> Project Assistant 1.5 hours S 67.00 S 100.50 <br /> Support Staff 1 hours S 52.00 S 52.00 <br /> Subtotal S 4,981.00 S 17,935.50 <br /> 04 Oakway Rd. from Cal Young Rd. to Coburg Rd. 4,750 feet Cores 6 <br /> On Site FWD testing and Coring FWD 95 <br /> FWD Unit (includes staff engineer) 0.5 each S 1,500.00 S 750.00 <br /> Staff Engineer 111 (core logging) 6.5 hours S 97.00 S 630.50 <br /> Flagging Subcontractor 1 each S 540.00 S 540.00 <br /> Drilling Subcontractor 1 each S 1,500.00 S 1,500.00 <br /> Data Reduction and Analysis <br /> Project Engineer 8 hours S 107.00 S 856.00 <br /> Laboratory Testing <br /> Moisture Content 8 each S 15.00 S 120.00 <br /> Wash Sieve Analysis 1 each S 80.00 S 80.00 <br /> Atterberg Limits 1 each S 105.00 S 105.00 <br /> Report Preparation <br /> Principal Engineer (review) 1 hour S 140.00 S 140.00 <br /> Project Engineer 6 hours S 107.00 S 642.00 <br /> Drafting 1.5 hours S 78.00 S 117.00 <br /> Project Assistant 1.5 hours S 67.00 S 100.50 <br /> Support Staff 1 hours S 52.00 S 52.00 <br /> Subtotal S 5,633.00 S23,568.50 <br /> 05 Chambers St. from Railroad Blvd. to W. 7th Ave. 5,690 feet Cores 6 <br /> On Site FWD [esting and Coring FWD 76 <br /> FWD Unit (includes staff engineer) 0.75 each S 1,500.00 S 1,125.00 <br /> Staff Engineer III (core logging) 6.5 hours S 97.00 S 630.50 <br /> Flagging Subcontractor 1 each S 540.00 S 540.00 <br /> Drilling Subcontractor 1 each S 2,000.00 S 2,000.00 <br /> Data Reduction and Analysis <br /> Project Engineer 9 hours S 107.00 S 963.00 <br /> Laboratory Testing <br /> Moisture Content 8 each S 15.00 S 120.00 <br /> Wash Sieve Analysis 1 each S 80.00 S 80.00 <br /> Atterberg Limits 1 each S 105.00 S 105.00 <br /> Report Preparation <br /> Principal Engineer (review) 1 hour S 140.00 S 140.00 <br /> Project Engineer 6 hours S 107.00 S 642.00 <br /> Drafting 1.5 hours S 78.00 S 117.00 <br /> Project Assistant 1.5 hours S 67.00 $ 100.50 <br /> Support Staff I hours S 52.00 S 52.00 <br /> Subtotal S 6,615.00 530,183.50 <br /> ~DW~UN? Attachment Eugene-4-01:082404 <br /> <br />