New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4270 GeoDesign Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4270 GeoDesign Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 9:15:21 PM
Creation date
6/20/2008 11:48:18 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
004270
GL_Project_Number
955554
Identification_Number
2005100195
COE_Contract_Number
2004-00028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
>:ugene-4-01 Proposal Cost Breakdown Supplemental Shep* <br /> <br /> ~r Cumulative <br /> Quantity Units Rate Subtotals Total <br /> 03 N. Danebo Ave. from Roosevelt Blvd. to W. 11 th Ave. 2,520 feet Cores 4 <br /> On Siie FWD testing and Coring FWD 50 <br /> FWD Unii (includes staff engineer) 0.5 each S 1,500.00 S 750.00 <br /> Staff Engineer III (core logging) 4.5 hours S 97.00 S 436.50 <br /> Flagging Subcontractor 1 each S 540.00 S 540.00 <br /> Drilling Subcontractor i each S 1,500.00 S 1,500.00 <br /> Data Reduction and Analysis <br /> Project Engineer 5 hours S 107.00 S 535.00 <br /> Laboratory Testing <br /> Moisture Content 6 each S 15.00 S 90.00 <br /> Wash Sieve Analysis 1 each S 80.00 S 80.00 <br /> Atterberg Limits 1 each S 105.00 S 105.00 <br /> Report Preparation <br /> Principal Engineer (review) 1 hour S 140.00 S 140.00 <br /> Project Engineer S hours S 107.00 S 535.00 <br /> Drafting 1.5 hours S 78.00 S 117.00 <br /> Project Assistant 1.5 hours S 67.00 S 100.50 <br /> Support Staff 1 hours S 52.00 S 52.00 <br /> Subtotal S 4,981.00 S 17,935.50 <br /> 04 Oakway Rd. from Cal Young Rd. to Coburg Rd. 4,750 feet Cores 6 <br /> On Site FWD testing and Coring FWD 95 <br /> FWD Unit (includes staff engineer) 0.5 each S 1,500.00 S 750.00 <br /> Staff Engineer 111 (core logging) 6.5 hours S 97.00 S 630.50 <br /> Flagging Subcontractor 1 each S 540.00 S 540.00 <br /> Drilling Subcontractor 1 each S 1,500.00 S 1,500.00 <br /> Data Reduction and Analysis <br /> Project Engineer 8 hours S 107.00 S 856.00 <br /> Laboratory Testing <br /> Moisture Content 8 each S 15.00 S 120.00 <br /> Wash Sieve Analysis 1 each S 80.00 S 80.00 <br /> Atterberg Limits 1 each S 105.00 S 105.00 <br /> Report Preparation <br /> Principal Engineer (review) 1 hour S 140.00 S 140.00 <br /> Project Engineer 6 hours S 107.00 S 642.00 <br /> Drafting 1.5 hours S 78.00 S 117.00 <br /> Project Assistant 1.5 hours S 67.00 S 100.50 <br /> Support Staff 1 hours S 52.00 S 52.00 <br /> Subtotal S 5,633.00 S23,568.50 <br /> 05 Chambers St. from Railroad Blvd. to W. 7th Ave. 5,690 feet Cores 6 <br /> On Site FWD [esting and Coring FWD 76 <br /> FWD Unit (includes staff engineer) 0.75 each S 1,500.00 S 1,125.00 <br /> Staff Engineer III (core logging) 6.5 hours S 97.00 S 630.50 <br /> Flagging Subcontractor 1 each S 540.00 S 540.00 <br /> Drilling Subcontractor 1 each S 2,000.00 S 2,000.00 <br /> Data Reduction and Analysis <br /> Project Engineer 9 hours S 107.00 S 963.00 <br /> Laboratory Testing <br /> Moisture Content 8 each S 15.00 S 120.00 <br /> Wash Sieve Analysis 1 each S 80.00 S 80.00 <br /> Atterberg Limits 1 each S 105.00 S 105.00 <br /> Report Preparation <br /> Principal Engineer (review) 1 hour S 140.00 S 140.00 <br /> Project Engineer 6 hours S 107.00 S 642.00 <br /> Drafting 1.5 hours S 78.00 S 117.00 <br /> Project Assistant 1.5 hours S 67.00 $ 100.50 <br /> Support Staff I hours S 52.00 S 52.00 <br /> Subtotal S 6,615.00 530,183.50 <br /> ~DW~UN? Attachment Eugene-4-01:082404 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.