liugene-4-O1 Proposal Cost Breakdown Supplemental Sheet <br /> Cumulative <br /> Quantity Units Rate Subtotals Total <br /> Initial Distress Survey for All Roads <br /> Project Engineer 18 hours S 107.00 S 1,926.00 <br /> Mileage 260 miles S 0.45 S 117.00 <br /> S 2,043.00 S 2,043.00 <br /> All FWD Testing Completed With Single Mobilization <br /> Staff Engineer III 4 hours S 97.00 S 388.00 <br /> Mileage 260 miles S 0.45 S 117.00 <br /> Per Diem 3 days S 100.00 S 300.00 <br /> S 805.00 S 2,848.00 <br /> All Coring Completed With Single Mobilization <br /> Staff Engineer III 4 hours S 97.00 S 388.00 <br /> Mileage 260 miles $ 0.45 S 117.00 <br /> Per Diem - 4 days S 100.00 S 400.00 <br /> S 905.00 S 3,753.00 <br /> O1 N. Bertelsen, from Royal Ave. to Roosevelt Blvd. 1,840 feet Cores 4 <br /> On Site FWD testing and Coring FWD 37 <br /> FWD Unit (includes staff engineer) 0.5 each S 1,500.00 S 750.00 <br /> Staff Engineer III (core logging) 4.5 hours S 97.00 S 436.50 <br /> Flagging Subcontractor (includes 12%markup) 1 each S 540.00 S 540.00 <br /> Drilling Subcontractor (includes 12%markup) 1 each S 1,500.00 S 1,500.00 <br /> Data Reduction and Analysis <br /> Project Engineer 5 hours S 107.00 S 535.00 <br /> Laboratory Testing <br /> Moisture Content 6 each S 15.00 S 90.00 <br /> Wash Sieve Analysis 1 each S 80.00 S 80.00 _ <br /> Atterberg Limits 1 each $ 105.00 S 105.00 <br /> Report Preparation <br /> Principal Engineer (review) 1 hour S 140.00 S 140.00 <br /> Project Engineer S hours S 107.00 S 535.00 <br /> Drafting 1.5 hours S 78.00 S 117.00 <br /> Project Assistant 1.5 hours S 67.00 S 100.50 <br /> Support Staff 1 hours S 52.00 S 52.00 <br /> Subtotal S 4,981.00 S 8,734.00 <br /> 02 Seneca Rd. from W. 7th Ave. to W. 11 th Ave. 1,300 feet Cores 3 <br /> On Site FWD testing and Coring FWD 26 <br /> FWD Unit (includes staff engineer) 0.25 each S 1,500.00 S 375.00 <br /> Staff Engineer III (core logging) 4 hours S 97.00 S 388.00 <br /> Flagging Subcontractor (includes 12%markup) 1 each S 540.00 S 540.00 <br /> Drilling Subcontractor (includes 12%markup) 1 each S 1,500.00 S 1,500.00 <br /> Data Reduction and Analysts <br /> Project Engineer 4 hours S 107.00 S 428.00 <br /> Laboratory Testing <br /> Moisture Content 3 each S 15.00 S 45.00 <br /> Wash Sieve Analysis 0 each S 80.00 S - <br /> Atterberg Limits 0 each S 105.00 S - <br /> Repor[ Preparation <br /> Principal Engineer (review) 1 hour S 140.00 S 140.00 <br /> Project Engineer 5 hours S 107.00 S 535.00 <br /> Drafting 1.5 hours S 78.00 S 117.00 <br /> Project Assistant 1.5 hours S 67.00 S 100.50 <br /> Support Staff 1 hours S 52.00 S 52.00 <br /> Subtotal S 4,220.50 512,954.50 <br /> <br /> ~D~IGNZ Attachment Eugene•4.01:082404 <br /> <br />