Eugene-4-01 Proposal Cost Breakdown Supplemenral chpet <br /> Cumulative <br /> Quantity Units Rate Subtotals Total <br /> 06 E. 23rd Ave. from Patterson St. to Hilyard St. 430 feet Cores 2 <br /> On Site FWD testing and Coring FWD 17 <br /> FWD Unit (includes staff engineer) 0.25 each S 1,500.00 S 375.00 <br /> Siaff Engineer III (core logging) 3 hours S 97.00 S 291.00 <br /> Flagging Subcontractor 1 each S 540.00 S 540.00 <br /> Drilling Subcontractor 1 each S 1,000.00 S 1,000.00 <br /> Data Reduction and Analysis <br /> Project Engineer 4 hours S 107.00 $ 428.00 <br /> Laboratory Testing <br /> Moisture Content 4 each S 15.00 S 60.00 <br /> Wash Sieve Analysis 0 each S 80.00 $ - <br /> Atterberg Limits 0 each S 105.00 S - <br /> Report Preparation <br /> Principal Engineer (review) 1 hour S 140.00 S 140.00 <br /> Project Engineer 5 hours S 107.00 S 535.00 <br /> Drafting 1.5 hours S 78.00 S 117.00 <br /> Project Assistant 1.5 hours S 67.00 S 100.50 <br /> Support Staff 1 hours S 52.00 S 52.00 <br /> Subtotal S 3,638.50 533,822.00 <br /> 07 N. Terry St. from Barger Dr. to end of street 3,920 feet Cores 4 <br /> On Site FWD testing and Coring FWD 78 <br /> FWD Unit (includes staff engineer) 0.5 each S 1,500.00 S 750.00 <br /> Staff Engineer III (core logging) 5 hours S 97.00 S 485.00 <br /> Flagging Subcontractor 1 each S 540.00 S 540.00 <br /> Drilling Subcontractor 1 each S 2,000.00 S 2,000.00 <br /> Data Reduction and Analysis <br /> Project Engineer 7 hours S 107.00 S 749.00 <br /> Laboratory Testing <br /> Moisture Content 6 each S 15.00 S 90.00 <br /> Wash Sieve Analysis 1 each S 80.00 S 80.00 <br /> Atterberg Limits 1 each S 105.00 S 105.00 <br /> Report Preparation <br /> Principal Engineer (review) 1 hour S 140.00 S 140.00 <br /> Project Engineer 6 hours S 107.00 S 642.00 <br /> Drafting 1.5 hours S 78.00 S 117.00 <br /> Project Assistant 1.5 hours S 67.00 S 100.50 <br /> Support Staff 1 hours S 52.00 S 52.00 <br /> Subtotal S 5,850.50 539,672.50 <br /> Additional Charges for Travel and Mileage if individual trips required for Each Road Section <br /> Per Diem (without overnight) 7 each S 20.00 S t 40.00 <br /> per Diem (with hotel) 7 each S (100.00) S (700.00) <br /> Travel Time(additionap 20 hours S 93.00 S 1,860.00 <br /> Mileage (additional) 1820 miles S 0.45 S 819.00 <br /> Subtotal S 2,119.00 S41,791.50 <br /> <br /> ~DU~GN? Attachment Eugene-4-01 :082404 <br /> <br />