<br /> • Eugene-6-01 Prouosal Cost Breakdown Suuolemental Sheet <br /> Cumulative <br /> Quantity Units Rate Subtotals Total <br /> Krver Ave from approxtmately 1 UU reef east of K1ver Hoatl <br /> 12 to approximately 362 feet east of River Rd 262 feet Cores 1 <br /> On Site FWD testing and Coring FWD 10 <br /> FWD Unit (includes staff engineer) 0.25 each S 1,500.00 S 375.00 <br /> Staff Engineer III (core logging) 2.0 hours S 100.00 S 200.00 <br /> Flagging Subcontractor (includes 12% markup) 0.25 each S 675.00 S 168.75 <br /> Drilling Subcontractor (includes 12% markup) 0.5 each S 1,000.00 S 500.00 <br /> Data Reduction and Analysis <br /> Project Engineer 5.0 hours S 1 10.00 S 550.00 <br /> Laboratory Testing <br /> Moisture Content 2.0 each S 12.00 S 24.00 <br /> Wash Sieve Analysis 0.0 each S 80.00 S - <br /> Atterberg Limits 0.0 each S 105.00 S - <br /> Report Preparation <br /> Principal Engineer (review) 1.0 hour S 145.00 S 145.00 <br /> Project Engineer 6.0 hours S 110.00 S 660.00 <br /> Drafting 3.0 hours S 81.00 S 243.00 <br /> Project Assistant 2.0 hours S 70.00 S 140.00 <br /> Support Staff 1.0 hours S 54.00 S 54.00 <br /> Subtotal S 3,059.75 S 99,392.05 <br /> Additional Charges for Travel and Mileage if individual trips required for Each Road Section <br /> Per Diem (without overnight) 17 each S 20.00 S 340.00 <br /> per Diem (with hotel) 18 each S (100.00) S (1,800.00) <br /> Travel Time (additional) 35 hours S 93.00 S 3,255.00 <br /> Mileage (additional) 3900 miles S 0.48 f 1,872.00 <br /> Subtotal S 3,667.00 S 103,059.05 <br /> ®~E51GN= Attachment Eugene•6-01:031805 <br /> <br />