<br /> • Eugene-6-O1 Proposal Cost Breakdown Suaalemental Sheet <br /> Cumulative <br /> Quantity Units Rate Subtotals Total <br /> 09 Goodpasture Island Road from Bridge Over Slough to Kingsle 2,547 feet Cores 5 <br /> On Site FWD testing and Coring FWD 51 <br /> FWD Unit (includes staff engineer) 0.4 each S 1,500.00 S 600.00 <br /> Staff Engineer III (core logging) 6.0 hours S 100.00 S 600.00 <br /> Flagging Subcontractor (includes 12% markup) 1.1 each S 675.00 S 742.50 <br /> Grilling Subcontractor (includes 12% markup) 0.6 each S 1,000.00 S 600.00 <br /> Data Reduction and Analysis <br /> Project Engineer 10.0 hours S 110.00 S 1,100.00 <br /> Laboratory Testing <br /> Moisture Content 7.0 each S 12.00 S 84.00 <br /> Wash Sieve Analysis 2.0 each S 80.00 S 160.00 <br /> Atterberg Limits 1.0 each S 105.00 S 105.00 <br /> Report Preparation <br /> Principal Engineer (review) 1.5 hour S 145.00 S 217.50 <br /> Project Engineer lO.Ohours f 110.00 S 1,100.00 <br /> Drafting 5.0 hours S 81.00 S 405.00 <br /> Project Assistant 3.0 hours S 70.00 S 210.00 <br /> Support Staff 1.5 hours S 54.00 S 81.00 <br /> Subtotal S 6,005.00 S 81,562.80 <br /> 10 Goodpasture Island Road from Norkenzie Rd to Ridgeway Dr 2,838 feet Cores 6 <br /> On Site FWD testing and Coring FWD 57 <br /> FWD Unit (includes staff engineer) 0.4 each S 1,500.00 S 600.00 <br /> Staff Engineer III (core logging) 6.5 hours S 100.00 S 650.00 <br /> Flagging Subcontractor (includes 12% markup) 1.1 each S 675.00 S 742.50 <br /> Drilling Subcontractor (includes 12% markup) 0.6 each S 1,000.00 S 600.00 <br /> Data Reduction and Analysis <br /> Project Engineer lO.Ohours S 110.00 S 1,100.00 <br /> Laboratory Testing <br /> Moisture Content 7.0 each S 12.00 S 84.00 <br /> Wash Sieve Analysis 2.0 each S 80.00 S 160.00 <br /> Atterberg Limits 1.0 each S 105.00 S 105.00 <br /> Report Preparation <br /> Principal Engineer (review) 1.5 hour S 145.00 S 217.50 <br /> Project Engineer 10.0 hours S 110.00 S 1,100.00 <br /> Drafting 5.0 hours S 81.00 S 405.00 <br /> Project Assistant 3.0 hours S 70.00 S 210.00 <br /> Support Staff 1.5 hours S 54.00 S 81.00 <br /> Subtotal S 6,055.00 S 87,617.80 <br /> 11 Seneca from Roosevelt to 7`h 4,387 feet Cores 8 <br /> On Site FWD testing and Coring FWD 88 <br /> FWD Unit (includes staff engineer) 0.7 each S 1,500.00 S 1,050.00 <br /> Staff Engineer III (core logging) 9.0 hours S 100.00 S 900.00 <br /> Flagging Subcontractor (includes 12% markup) 2.0 each S 675.00 S 1,350.00 <br /> Drilling Subcontractor (includes 12%markup) 1.2 each S 1,000.00 S 1,200.00 <br /> Data Reduction and Analysis <br /> Project Engineer 12.0 hours S 110.00 S 1,320.00 <br /> Laboratory Testing <br /> Moisture Content 9.0 each S 12.00 S 108.00 <br /> Wash Sieve Analysis 2.0 each S 80.00 S 160.00 <br /> Atterberg Limits 1.0 each S 105.00 S 105.00 <br /> Report Preparation <br /> Principal Engineer (review) 1.5 hour S 145.00 S 217.50 <br /> Project Engineer 13.0 hours S 110.00 S 1,430.00 <br /> Drafting 6.0 hours S 81.00 S 486.00 <br /> Project Assistant 4.0 hours S 70.00 S 280.00 <br /> Support Staff 2.0 hours S 54.00 S 108.00 <br /> Subtotal S 8,714.50 S 96,332.30 <br /> ~~FSIGN~ Attachment Eugenr6-01:031805 <br /> <br />