<br /> • GEOTECHNICAL SCHEDULE OF CHARGES <br /> COMPENSATION <br /> Our compensation will be determined on the basis of time and expenses in accordance with the following schedule unless <br /> a fixed fee amount is so indicated in the proposal or services agreement. Contracted professional and technical services <br /> will be charged at the applicable hourly rates as listed below. Staff time spent in depositions, trial preparation, and court <br /> or hearing testimony will be billed at one and one-half times the below rates. Time spent in either local or inter-city <br /> travel, when travel is in the interest of this contract, will be charged in accordance with the foregoing schedule; when <br /> traveling by public carrier, a maximum charge of eight hours per day will be made. Current rates are as follows: <br /> Personnel Hourly Rate <br /> Senior Principal S 155 <br /> Principal S 145 <br /> Senior Associate $ 140 <br /> Associate S 135 <br /> Senior Project Manager S 125 <br /> Project Manager II S 118 <br /> Project Manager I S 110 <br /> Engineering/Geological Staff III S 100 <br /> Engineering/Geological Staff II ; g2 <br /> Engineering/Geological Staff I g 84 <br /> Senior Technician/CAD S 81 <br /> Technician/Project Assistant II g 75 <br /> Technician/Project Assistant S 70 <br /> Support Staff S 54 <br /> Equipment Rate <br /> Air compressor, generator (per day) S 42 <br /> Digital Camera (per day) S 10 <br /> Field CBR equipment (per day) S 220 <br /> FWD (falling-weight deflectometer), (per day) S 1,500 <br /> GPR (ground penetrating radar), (per day) S 400 <br /> GPS (global positioning system), (per day) S 100 <br /> Miscellaneous geotechnical field equipment, including: cement scale, $ 20 <br /> compaction testing equipment, and pan (per equipment item, per day) <br /> Nuclear density gauge equipment (per hour, 2-hour minimum) S 18 <br /> PDA (pile driving analyzer), (per day) $ 1,750 <br /> SASW (spectral analysis of surface waves), (per day) S 1,500 <br /> Schmidt Hammer (per day) S 100 <br /> Slope inclinometer equipment (per day) g 2g0 <br /> Soil samples in brass or stainless sleeves (per sample) S 10 <br /> Soil samples in rings (per sample) S 10 <br /> Specialty Software (MODFLOW, PLAXIS, etc., per hour) S 15 <br /> Vehicle (company) usage (half day, plus per mile charges) S 20 <br /> Vehicle (personal) usage (per mile) S 0.48 <br /> Water measurement and sampling equipment (per equipment item, per day) S 30 <br /> Reproduction Rate <br /> Black/white 8'r4 x 11 (per finished page) S 0.12 <br /> Black/white 1 1 x 17 (per finished page) $ 0.30 <br /> Color prints 8 x 11 (per finished page) $ 1.15 <br /> Color prints 11 x 17 (per finished page) S 1.50 <br /> C- or D-size plots (per finished plot) S 25 <br /> OTHER SERVICES, SUPPLIES, AND SPECIAL TAXES <br /> Outside services (equipment, supplies, and facilities not furnished in accordance with the above schedule, and any <br /> unusual items of expense not customarily incurred in our normal operations) are charged at cost plus 12 percent. This <br /> includes.shipping charges, subsistence, transportation, printing and reproduction, miscellaneous supplies and rentals, <br /> surveying services, drilling equipment, construction equipment, watercraft, aircraft, and special insurance which may be <br /> required. Specialized equipment will be quoted on a per <br /> job basis. In-house disposable field supplies (routinely used field <br /> supplies stocked in-house by GeoDesign), at current rates. List available upon request. Taxes required by local <br /> jurisdictions for projects in specific geographic areas will be charged to projects at direct cost. <br /> Each invoice will include a charge of 3 percent of GeoDesign staff time to cover the cost of local, long distance, and <br /> cellular telephone; computers; fax; and regular USPS postage. <br /> All rates are subject to change upon notification. <br /> G N? GeotechnicalScheduleofCharges:010105 <br /> <br />