Euaene•6-Ol Proposal Cost Breakdown Suoalemental Sheet <br /> Cumulative <br /> Quantity Units Rate Subtotals Total <br /> O6 Mckiniey from 5th to 11 `h 2,359 feet Cores 5 <br /> On Site FWD testing and Coring FWD 47 <br /> FWD Unit (includes staff engineer) 0.4 each S 1,500.00 S 600.00 <br /> Staff Engineer III (core logging) 6.5 hours S 100.00 S 650.00 <br /> flagging Subcontractor (includes 12% markup) 1.1 each S 675.00 S 742.50 <br /> Drilling Subcontractor (includes 12% markup) 0.6 each S 1,000.00 S 600.00 <br /> Data Reduction and Analysis <br /> Project Engineer 10.0 hours S 110.00 S 1,100.00 <br /> Laboratory Testing <br /> Moisture Content 7.0 each S 12.00 S 84.00 <br /> Wash Sieve Analysis 2.0 each S 80.00 S 160.00 <br /> Atterberg Limits 1.0 each S 105.00 S 105.00 <br /> Report Preparation <br /> Principal Engineer (review) 1.5 hour S 145.00 S 217.50 <br /> Project Engineer 10.0 hours S 110.00 S 1,100.00 <br /> Drafting 5.0 hours S 81.00 S 405.00 <br /> Project Assistant 3.0 hours S 70.00 S 210.00 <br /> Support Staff 1.5 hours S 54.00 S 81.00 <br /> Subtotal S 6,055.00 S 57,843.30 <br /> 07 Danebo from Barger to Souza 1,487 feet Cores 3 <br /> On Site FWD testing and Coring FWD 40 <br /> FWD Unit (includes staff engineer) 0.3 each S 1,500.00 S 450.00 <br /> Staff Engineer Itl (core logging) 4.5 hours S 100.00 S 450.00 <br /> Flagging Subcontractor (includes 12% markup) 1.0 each S 675.00 S 675.00 <br /> Drilling Subcontractor (includes 12% markup) 0.7 each S 1,000.00 S 700.00 <br /> Dara Reduction and Analysis <br /> Project Engineer 7.0 hours S 110.00 S 770.00 <br /> Laboratory Testing <br /> Moisture Content 5.0 each S 12.00 S 60.00 <br /> Wash Sieve Analysis 2.0 each S 80.00 S 160.00 <br /> Atterberg Limits 1.0 each S 105.00 S 105.00 <br /> Report Preparation <br /> Principal Engineer (review) 1.5 hour S 145.00 S 217.50 <br /> Project Engineer 9.0 hours S 1 10.00 S 990.00 <br /> Drafting 4.0 hours S 81.00 S 324.00 <br /> Project Assistant 3.0 hours S 70.00 S 210.00 <br /> Support Staff 1.5 hours S 54.00 S 81.00 <br /> Subtotal S 5,192.50 S 63,035.80 <br /> O8 Roosevelt from HWY 99N to Beltline 9,728 feet Cores 14 <br /> On Site FWD testing and Coring FWD 195 <br /> FWD Unit (includes staff engineer) 1.0 each S 1,500.00 S 1,500.00 <br /> Staff Engineer III (core logging) 17.0 hours S 100.00 S 1,700.00 <br /> Flagging Subcontractor (includes 12% markup) 2.5 each S 675.00 S 1,687.50 <br /> Drilling Subcontractor (includes 12X markup) 2.0 each S 1,000.00 S 2,000.00 <br /> Data Reduction and Analysis <br /> Project Engineer 15.0 hours S 110.00 S 1,650.00 <br /> Laboratory Testing <br /> Moisture Content 16.0 each S 12.00 S 192.00 <br /> Wash Sieve Analysis 5.0 each S 80.00 S 400.00 <br /> Atterberg Limits 3.0 each S 105.00 S 315.00 <br /> Report Preparation <br /> Principal Engineer (review) 2.5 hour S 145.00 S 362.50 <br /> Project Engineer 16.0 hours S 110.00 S 1,760.00 <br /> Drafting 7.0 hours S 81.00 S 567.00 <br /> Project Assistant 4.0 hours S 70.00 S 280.00 <br /> Support Staff 2.0 hours S 54.00 S 108.00 <br /> Subtotal S 12,522.00 S 75,557.80 <br /> <br /> ®DESIGNy Attachment - Eugene-601:031805 <br /> <br />