<br /> • Euctene-6-Ol Proposal Cost Breakdown Supplemental Sheet <br /> Cumulative <br /> Quantity Units Rate Subtotals Total <br /> 03 Agate from 28-feet south of 13th Curb Return to 22 n° 3,630 feet Cores 7 <br /> On Site FWD testing and Coring FWD 73 <br /> FWD Unit (includes staff engineer) 0.5 each S 1,500.00 S 750.00 <br /> Staff Engineer III (core logging) 8.5 hours S 100.00 S 850.00 <br /> Flagging Subcontractor (includes 12%markup) 1.5 each S 675.00 S 1,012.50 <br /> Drilling Subcontractor(inciudes 12%markup) 1.0 each S 1,000.00 S 1,000.00 <br /> Data Reduction and Analysis <br /> Project Engineer 10.0 hours S 110.00 S 1,100.00 <br /> Laboratory Testing <br /> Moisture Content 8.0 each S 12.00 S 96.00 <br /> Wash Sieve Analysis 2.0 each S 80.00 S 160.00 <br /> Atterberg Limits 1.0 each S 105.00 S 105.00 <br /> Report Preparation <br /> Principal Engineer (review) 2.0 hour S 145.00 S 290.00 <br /> Project Engineer 11.0 hours S 110.00 S 1,210.00 <br /> Drafting 5.0 hours S 81.00 S 405.00 <br /> Project Assistant 3.0 hours S 70.00 S 210.00 <br /> Support Staff 2.0 hours S 54.00 S 108.00 <br /> Subtotal S 7,296.50 S 33,101.30 <br /> 04 18th Ave from 510-feet east of Chambers intersection to Bail 8,495 feet Cores 14 <br /> On Site FWD testing and Coring FWD 170 <br /> FWD Unit (includes staff engineer) 1.0 each S 1,500.00 S 1,500.00 <br /> Staff Engineer III (core logging) 17.0 hours S 100.00 S 1,700.00 <br /> Flagging Subcontractor (includes 12%markup) 2.5 each S 675.00 S 1,687.50 <br /> Drilling Subcontractor (includes 12%markup) 2.0 each S 1,000.00 S 2,000.00 <br /> Data Reduction and Analysis <br /> Project Engineer 15.0 hours S 110.00 S 1,650.00 <br /> Laboratory Testing <br /> Moisture Content 16.0 each S 12.00 S 192.00 <br /> Wash Sieve Analysis 5.0 each S 80.00 S 400.00 <br /> Atterberg Limits 3.0 each S 105.00 S 315.00 <br /> Report Preparation <br /> Principal Engineer (review) 2.5 hour S 145.00 S 362.50 <br /> Project Engineer 17.0 hours S 110.00 S 1,870.00 <br /> Drafting 7.0 hours S 81.00 S 567.00 <br /> Project Assistant 4.0 hours S 70.00 S 280.00 <br /> Support Staff 2.0 hours S 54.00 S 108.00 <br /> Subtotal S 12,632.00 S 45,733.30 <br /> 05 Garfield from 6`" to 13`" 2,744 feet Cores 5 <br /> On Site FWD testing and Coring FWD 55 <br /> FWD Unit (includes staff engineer) 0.4 each S 1,500.00 S 600.00 <br /> Staff Engineer III (core logging) 6.5 hours S 100.00 S 650.00 <br /> Flagging Subcontractor (includes 12% markup) 1.1 each S 675.00 S 742.50 <br /> Drilling Subcontractor (includes 12%markup) 0.6 each S 1,000.00 S 600.00 <br /> Data Reduction and Analysis <br /> Project Engineer 10.0 hours S 110.00 S 1,100.00 <br /> Laboratory Testing <br /> Moisture Content 7.0 each S 12.00 S 84.00 <br /> Wash Sieve Analysis 2.0 each S 80.00 S 160.00 <br /> Atterberg Limits 1.0 each S 105.00 S 105.00 <br /> Report Preparation <br /> Principal Engineer (review) 1.5 hour S 145.00 S 217.50 <br /> Project Engineer 10.0 hours S 110.00 S 1,100.00 <br /> Drafting 5.0 hours S 81.00 S 405.00 <br /> Project-Assistant 3.0 hours S 70.00 S 210.00 <br /> Support Staff 1.5 hours S 54.00 S 81.00 <br /> Subtotal S 6,055.00 S 51,788.30 <br /> ~~ESIGN= Attachment - Eugenr6-01:031 SOS <br /> <br />