New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4299 Bergeson-Boese Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4299 Bergeson-Boese Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2008 8:30:51 AM
Creation date
6/19/2008 1:36:29 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
004299
GL_Project_Number
925106
Identification_Number
2008100173
COE_Contract_Number
2008-00215
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
aa' ~v~(f' I.~ I <br /> Bergeson-Boese & Associates, Inc. <br /> ' Comprehensive Environmental Services <br /> f~ <br /> "R.r' s. <br /> ~ ~ a <br /> ~ ~a~ <br /> SCOPE OF WORK ANO COST ESTIMATE <br /> s <br /> Field Investigative Services for <br /> ..it- .e Environmental and Geotechnical Assessment <br /> ' ~ ~ " ` E of Former Gravel Extraction Site <br /> ~ or <br /> 6 ~ <br /> <br /> ` ° CLIENT AND PROJECT LOCATION <br /> ~ .i` ' f City of Eugene <br /> Public Works, Engineering <br /> 244 E. Broadway <br /> Eugene, Oregon 97401 <br /> Contact Terry Colvin <br /> Telephone (541) 682=5398 <br /> FAX (541) fi82-8410 <br /> PROJECT DATA <br /> Site Location Tax lot 1300, tax map 17 0429 11, Lane County, <br /> Eugene, Oregon <br /> Site Area 1.54 Acres <br /> Fill Area 1 Acre (approximate) <br /> fill Materials Structural materials (e.g., concrete, asphalt, <br /> demolition debris), brush, land clearing debris, and <br /> misce{laneous other <br /> OBJECTII/ES <br /> The two (2) primary objectives of this investigation are to evaluate potential <br /> environmental impacts and the structural suitability of fill materials placed in a <br /> former aggregate extraction area of approximately one (1) acre in-size. The <br /> overall objective of the environmental investigation is to assess the potential <br /> presence of contaminated media in fill materials and/or impact to soil and/or <br /> groundwater associated with the fill materials. The overall objective of the <br /> geotechnical study is to assess the types of fill materials and the overall <br /> suitability of the material as structural fill. <br /> Serving commerdal, in~strial, residential, and puWk dientele throughout Oregon, soutinvest Washirgron, and rwrthern California since 1989. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.