_ <br /> CITY OF EUGENE CONTRACT 2008-00215 <br /> Exhibit B -Scope of Work <br /> Bergeson-Bowe & Associates, Inc. <br /> ~ Comprehensive Environmental Services <br /> ere' <br /> • ' ~ August 24, 2007 <br /> ' ` ~ • City of Eugene <br /> ` ~ ~ ` Public Works, Engineering <br /> 244 E. Broadway <br /> Eugene, Oregon 97401 . <br /> Attn.: Terry Calvin <br /> 6 " <br /> <br /> ~ • ` ~ ~ RE: Scope of Work and Cost Estimate for Environmental and <br /> , Geotechnical Assessment of Fill Area located on Tax lot 1300, tax <br /> E ~ ? map 17 04 29 11, Lane County, Eugene, Oregon <br /> .r. Dear Mr. Colvin: <br /> M~ <br /> Please find two copies of a proposed scope of work and cost estimate to complete <br /> the an environmental and geotechnical investigation of a former fill area of <br /> approximately one (1) acre located on the land parcel identified above. A range of <br /> costs for the environmental investigation are possible, primarily depending on the <br /> scope of laboratory analysis, and the cost presented in the proposal are oonsideried <br /> to reflect the maximum scope or °worst case" conditions. If the proposal is <br /> acceptable, please sign and return one copy and retain the other for your files. <br /> Should you have any questions regarding the scope of work or cost estimate <br /> presented in the proposal, please do not hesitate to contact me at your convenience. <br /> Thank you for the opportunity to be of service. <br /> Sincerely, <br /> Ber on-Bowe)&~Associates, tnc. <br /> ~~,tM <br /> Daniel F. umford <br /> Principal <br /> Enclosures <br /> DM: <br /> Serving commercial, indutrial, residerMlal, and pr~lk dknbde ttxnughout Oregon, sorRtnvest Washington, and nortlrern Calilhrrua shoe 1989. <br /> <br />