New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4299 Bergeson-Boese Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4299 Bergeson-Boese Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2008 8:30:51 AM
Creation date
6/19/2008 1:36:29 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
004299
GL_Project_Number
925106
Identification_Number
2008100173
COE_Contract_Number
2008-00215
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
13.4 Location. When an inspection is made in the plant or place of business of a Contractor or subcontractor, such Contractor <br /> or subcontractor shall provide without charge all reasonable facilities and assistance for the safety and convenience of the <br /> <br /> ~,,i person performing the inspection or testing. <br /> 13.5 Time of testing or inspection. Inspection or testing of supplies and services performed at the plant or place of business <br /> of any Contractor or subcontractor shall be performed at reasonable times during normal business hours. <br /> 13.6 Inspection of construction projects. On site inspection of construction shall be performed in accordance with the <br /> provisions of the contract. <br /> 14 Termination in the publlc interest (Eugene Public Contracting Regulations, 15.4.5). <br /> 14.1 Termination provisions. The City may terminate the contract when required by the public interest including, at <br /> minimum, for the following: <br /> 14.1.1 If the Contractor is prevented from completing the work for reasons beyond the control of the City; <br /> 14.1.2 If completion of the project is beyond control of the Contractor; or <br /> 14.1.3 For any reason considered by the city manager to be in the public interest. These reasons may include, but are <br /> not necessarily limited to, non-availability of materials, lads of funds, phenomenon of nature of catastrophic <br /> proportions or intensity, executive orders of the President related to national defense, congressional or state acts <br /> related to funding or changes in applicable laws. <br /> 14.2 Payment when contract is terminated. When the contract, or any portion thereof, is terminated before completion of all <br /> items of work in the contract, payment will be made for the actual items of work completed under the contract, or by <br /> mutual agreement, for items of work partially completed. No claim for loss of antidpated profits will be allowed. <br /> Standard Contract Provisions-Page 5 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.