K & A Engineering, Inc. <br /> K & A Engineering, inc. will be on-site to log the borings and provide an-site supervision of drilling and will <br /> provide a written report summarizing the field investigation and making recommendations for the depth, nature, <br /> and extent of fills, natural undisturbed soils, and groundwater. <br /> Alternative 2: Bergeson-Bosse Prime Contractor <br /> Bergeson-Bosse will schedule the work with the City of Eugene and be responsible for all financial transactions <br /> and reporting of drill records to the State of Oregon. <br /> K & A Engineering, Inc. will be on-site to log the borings and provide on-site supervision of drilling and will <br /> provide a written report summarizing the field investigation and making recommendations for the depth, nature, <br /> and extent of fills, natural undisturbed soils, and groundwater. <br /> COST OF PROPOSED SERVICES: <br /> Alternative 1 <br /> The cast for Aftemative 1 to the City of Eugene would be a fixed-price fee for engineering of $3,800 and an <br /> ,estimated cost for drilling of $5,600. <br /> Alternative 2 <br /> The cost for our services to Bergeson-Bosse for Altemative 2 is a fixed-price fee of $3,800. <br /> SCHEDULE FOR PROPOSED GEOTECHNiCAt ENGINEERING SERVICES <br /> We can schedule fieldwork in the first haft of September 2007 depending on the availability of the dnll <br /> equipment and personnel. A final report can be available within 3-weeks after the completion of fieldwork. <br /> Thank you for the opportunity to be of service. Please callrf you have any questions. <br /> Sincerety, <br /> Michael Remboldt, P.E. <br /> K & A Engineering, Inc: <br /> Project: City of Eugene Tax lot 1300, tax map 17 04 2911, Eugene Oregon Page 2 of 2 <br /> <br /> rr Client: Bergeson-Bosse August 23, 2007 <br /> <br />