<br /> Run Date: 07/05/2005 10:02:36 Page B <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No 001 <br /> Contractor: 2G CONST. Original Contract: $370,333.81 <br /> Job 93-004310 Current Amount: $370,333.81 <br /> Contract No: 2005-00029 Contract Award Date: 05/23/2005 <br /> PO 2005050488 Completion Date: 10/05/2005 <br /> Assessable: Yes <br /> Current Contract Estimated Payment Cumulative Totals ~ Complete <br /> Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quaat ity Amount <br /> L110 SUBGRADE GEOTEXTILH $1.03 SQYD 585.000 $602.55 0.000 $0.00 0.000 $0.00 0.00 <br /> 1120 3/4 INCH-0 AGGREGATE BASE SURF $1.00 SQFT 225.000 $225.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 1130 1 1/2"-0 AGGREGATE BASE $18.04 CUYD 114.000 $2,056.56 0.000 $0.00 0.000 $0.00 0.00 <br /> L140 LEVEL 2 1/2 INCH DENSE HMAC $5.57 SQFT 684.000 $3,809.88 0.000 $0.00 0.000 $0.00 0.00 <br /> L150 PLAIN CONC PVMNT, UNDOWELLED, $5.52 SQFT 5,263.000 $29,051.76 0.000 $0.00 0.000 $0.00 0.00 <br /> L160 CONCRETE PUMPING $0.14 SQFT 5,581.000 $781.34 0.000 $0.00 0.000 $0.00 0.00 <br /> L170 5 INCH CONC SURFACING $3.09 SQFT 318.000 $982.62 0.000 $0.00 0.000 $0.00 0.00 <br /> L180 TOPSOIL $6.77 SQFT 79.000 $534.83 0.000 $0.00 0.000 $0.00 0.00 <br /> L190 TIH BARS $6.49 EACH 93.000 $603.57 0.000 $0.00 0.000 $0.00 0.00 <br /> 1200 SAW CUTTING $2.64 LINFT 548.000 $1,946.72 0.000 $0.00 0.000 $0.00 0.00 <br /> L210 HEDGE REMOVAL $187.00 LUMPSUM 1.000 $187.00 0.000 $0.00 0.000 $0.00 0.00 <br /> L220 RETAINING WALL $537.00 LUMPSUM 1.000 $537.00 0.000 $0.00 0.000 $0.00 0.00 <br /> Llley #29 <br /> !230 MOBILIZATION $1,760.08 LUMPSUM 1.000 $1,760.06 0.000 $0.00 0.000 $0.00 0.00 <br /> L240 TEMP PROTECTN/DIR$CTN $1,975.00 LUMPSUM 1.000 $1,975.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 250 EROSION CONTROL $303.00 LUMPSUM 1.000 $303.00 0.000 $0.00 0.000 $0.00 0.00 <br /> .260 10" DRAIN PIPE $33.63 LINFT 28.000 $947.24 0.000 $0.00 0.000 $0.00 0.00 <br /> _270 CATCH BASINS _ $1,140.00 EACH 1.000 $1,140.00 0.000 $0.00 0.000 $0.00 0.00 <br /> _280 CONNECTION TO EXISTING STRUCTU $248.00 EACH 1.000 $248.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 290 GENERAL EXCAVATION $23.68 CUYD 55.000 $1,302.40 0.000 $0.00 0.000 $0.00 0.00 <br /> <br />