Run Date: 07/05/2005 10:02:36 <br /> Page 9 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No 001 <br /> Contractor: 2G CONST. Original Contract: $370,333.61 <br /> Job 93-004310 Current Amount: $370,333.81 <br /> Contract No: 2005-00029 Contract Award Date: 05/23/2005 <br /> PO 2005050488 Completion Date: 10/05/2005 <br /> Assessable: Yes <br /> Current Contract Estimated Payment Cumulative Totals 8 Complete <br /> Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount antit Amount <br /> 1300 SUBGRADS STABILIZATION $13.86 CUYD 32.000 <br /> $443.52 0.000 $0.00 0.000 $0.00 0.00 <br /> 1310 SUBGRADS GSOTHXTILH $1.03 SQYD 184.000 $189.52 0.000 $0.00 0.000 $0.00 0.00 <br /> 1320 PLAIN CONC PVMNT, UNDOWELLSD 5.58 S FT 1,653..000 9,223.74 0.000 0.00 0.000 $0.00 0.00 <br /> 1330 CONCRETE PUMPING $0.31 SQFT 1,768.000 <br /> $548.08 0.000 $0.00 0.000 $0.00 0.00 <br /> 1340 1 1/2"-0 AGGRSGATE SASE $18.04 CUYD 36.000 $649.44 0.000 $0.00 0.000 $0.00 0.00 <br /> 1350 5 INCH CONC SURFACING 4.27 SQFT 115.000 $491.05 0.000 $0.00 0.000 $0.00 0.00 <br /> 1360 4 INCH CONC WALK $7.78 SQFT 14.000 $108.92 0.000 $0.00 0.000 $0.00 0.00 <br /> 1370 TOPSOIL <br /> $6.77 SQPT 22.000 $148.94 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 1380 TIS BARS $14.00 EACH 4.000 $56.00 0.000 $0.00 0.000 0.00 0.00 <br /> 1390 SAW CUTTING $2.64 LINFT 150.000 $396.00 0.000 $0.00 0.000 $0.00 0.00 <br /> Alley #32 <br /> 1400 MOBILIZATION $2,500.24 LUMPSUM 1.000 $2,500.24 0.000 $0.00 0.000 $0.00 0.00 <br /> 1410 TEMP PROTECTN/DIRSCTN $1,975.00 LUMPSUM 1.000 1,975.00 0.000 $0.00 0.000 0.00 0.00 <br /> 1420 SROSION CONTROL $303.00 LUMPSUM 1.000 $303.00 0.000 $0.00 0.000 $0.00 D.00 <br /> 1430 10" DRAIN PIPS $33.86 LINFT 28.000 $948.08 0.000 $0.00 0.000 $0.00 0.00 <br /> 1440 ADJUST CLEANOUT 152.00 EACH 1.000 $152.00 0.000 $0.00 0.000 0.00 0.00 <br /> 1450 MINOR ADJUSTMENT OP MANHOLES $207.00 EACH 1.000 $207.00 0.000 $0.00 0.000 $0.00 0.00 <br /> <br /> 1460 CATCH BASINS $1,027.00 EACH 2.000 $2,054.00 0.000 $0.00 0.000 $0.00 0.00 <br /> <br /> 1470 GSNSRAL SXCAVATION $19.52 CUYD 100.000 <br /> $1,952.00 0.000 $0.00 0.000 $0.00 0.00 <br /> <br /> 1480 SUBGRADS STABILIZATION $13.86 CUYD 45.000 $623.70 0.000 $0.00 0.000 $0.00 0.00 <br /> <br />