Run Date: 07/05/2005 10:02:36 <br /> City of Eugene Page 7 <br /> Contract Preliminary Progress Payment <br /> Payment No 001 <br /> Contractor: 2G CONST. Original Contract: $370,333.81 <br /> Job 93-004310 Current Amount: <br /> $370,333.81 <br /> Contract No: 2005-00029 Contract Award Date: OS 23 2005 <br /> PO 2005050488 Completion Date: 10/05/2005 <br /> Assessable: Yes <br /> Current Contract Estimated Payment Cumulative Totals $ Complete <br /> Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br /> 0920 CONCRETE PUMPING $0.23 SQFT 2,420.000 $556.60 0.000 $0.00 0.000 $0.00 0.00 <br /> 0930 TOPSOIL 6.77 SQFT 100.000 $677.00 0.000 $0.00 0.000 <br /> o.oo o.oo <br /> 0940 TIE BARS $6.49 EACH 26.000 $168.74 0.000 $0.00 0.000 <br /> $0.00 0.00 <br /> 0950 SAW CUTTING $2.64 LINFT 41.000 $108.24 0.000 $0.00 0.000 $0.00 0.00 <br /> 0960 STUMP REMOVAL 200.00 LUMPSUM 1.000 $200.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0970 REMOVE HEDGE $187.00 LUMPSUM 1.000 $187.00 0.000 $0.00 0.000 $0.00 0.00 <br /> Alley #23 <br /> 0980 MOBILIZATION $5,656.99 LUMPSUM 1.000 $5,656.99 0.000 $0.00 0.000 $0.00 0.00 <br /> 0990 TEMP PROTSCTN DZRECTN $3,278.00 LUMPSUM 1.000 3,278.00 0.000 $0.00 0.000 <br /> $0.00 0.00 <br /> 1000 TREE PROTECTION FBNCING $5.17 LZNFT 25.000 $129.25 0.000 $0.00 0.000 $0.00 0.00 <br /> 1010 EROSION CONTROL $303.00 LUMPSUM 1.000 $303.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 1020 10" DRAIN PIPS $31.94 LINFT 34.000 $1,085.96 0.000 $0.00 0.000 $0.00 0.00 <br /> 1030 12" DRAIN PIPE $32.03 LINFT 58.000 $1,857.74 0.000 $0.00 0.000 $0.00 0.00 <br /> 1040 TEE/STM 10" X 12" $372.00 EACH 1.000 $372.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 1050 MINOR ADJUSTt~BNT OF MANHOLES 262.00 EACH 1.000 $262.00 0.000 $0.00 0.000 0.00 0.00 <br /> 1060 ADJUST CLEANOUT $152.00 EACH 1.000 $152.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 1070 CATCH BASINS $1,035.00 EACH 3.000 $3,105.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 1080 CONNECTION TO EXISTING STRUCTU $303.00 EACH 3.000 909.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 1090 GHNERAL EXCAVATION $23.14 CUYD 181.000 $4,188.34 0.000 $0.00 0.000 $0.00 0.00 <br /> <br /> 1100 SUBGRADS STABILIZATION $20.43 CUYD 95.000 $1,940.85 0.000 $0.00 0.000 $0.00 0.00 <br /> <br />