00749.00 Scope ~ ' <br /> (ADD} All HMAC paving work shat! be in accordance with Section 00749. <br /> (ADD) 00749.47 Sealing <br /> (a} Joint Sealing -Where new asphalt pavement is consfructed to meet existing <br /> AC pavement the Contractor shall seal the joint with CSS-1 and sand; The <br /> sealant shall be sprayed on with a pressurized sprayer. <br /> (b) Emulsified Asphalt Fog Seal -Provide emuisifled asphalt fog seal <br /> according to section 00705 to speed tables, speed bumps, speed humps, small <br /> or irregular areas, or other areas as defined in section 00745.49(e). : <br /> (ADD} Section 00757 -Roller Compacted Concrete Pavement <br /> i <br /> Description . <br /> 00757.00 Scope -This work consists of constructing roller compacted concrete pavement <br /> as shown and specified. <br /> 00757.01 Abbreviations: <br /> GPT - Graphic Profile Test <br /> LSL - ~ Lower Specification Limit <br /> PI - Profile Index <br /> RCC - Roller Compacted Concrete <br /> SSD - Saturated Surface-Dry <br /> SSFC - Stationary Side Form Construction <br /> SSTV - Sublot Strength Test Value <br /> USL - Upper Specification Limit <br /> 00757.04 Aggregate Production and Prepaving Conference: <br /> (a} Aggregate Production Conference -Supervisory personnel of the Contractor and any <br /> subcontractor's or supplier's who are to be involved in the aggregate production work shall meet <br /> with the Project Manager, at a mutually agreed time, to discuss methods of accomplishing <br /> aggregate production. <br /> {b) Prepaving Conference -Supervisory personnel of the Contractor and any <br /> subcontractor's who are to be involved in the roller compacted concrete paving wark.shalt meet <br /> with the Project Manager, at a mutually agreed time, to discuss methods of accomplishing ail <br /> phases of the paving work. <br /> <br /> Special Provisions -Job #4317 Page 3 of 26 <br /> <br />