New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4317 Eugene Sand & Gravel Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4317 Eugene Sand & Gravel Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 2:52:42 PM
Creation date
6/19/2008 10:29:37 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004317
GL_Project_Number
955654
Identification_Number
2008100350
COE_Contract_Number
2008-00017
Retention_Destruction_Date
9/10/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
In addition, in areas where surfacing is altered or removed from multi-use <br /> paths, sidewalks and footpaths resurtace the areas with asphalt concrete or <br /> concrete in accordande to ADA standards each day if the areas are open to <br /> pedestrian or bicycle traffic. <br /> • The contractor shall provide five (5) business days prior notification to <br /> Sanipac Dispatch office, (541) 736-3618 for all activities which will affect their <br /> operations. The contractor shall also notify Sanipac on a. daily basis of <br /> specific work activities, location, and schedule. <br /> 00225.05 Contractor's Traffic Controi Pian <br /> (DELETE) The first sentence. <br /> (ADD) 'The Traffic Control Pian in the plan set has been approved, by the Engineer, for <br /> use by the Contractor. It is the Contractor's responsibility to modify this TCP as <br /> necessary to provide a complete TCP for the Contractor's Work operations. Any <br /> modifications to this plan requires that the Contractor shall submit a detailed work <br /> schedule showing stage construction along with the Traffic Control Plan(s) (TCP) <br /> in writing five (5) Work. days before the pre-construction conference for <br /> approval. If, as determined by the Engineer, the TCP does not meet these <br /> requirements the TCP will be rejected and no adjustment of Contract Time will be <br /> allowed. <br /> 00225.90A Method "B"- Lump Sum Basis - <br /> (DELETE) Entire paragraph. <br /> (ADD) Payment for the item °Temporary Work Zone Traffic Controi, Complete" will be <br /> made at the Contract lump sum amount .and will be for fumishing, installing, <br /> moving, operating, maintaining, inspecting, and removing materials and TCD <br /> (excluding temporary striping and City Provided Special Information signs), and <br /> for fumishing all equipment, labor, and incidentals necessary to complete the <br /> work as specified. <br /> Revisions to the provided TCP necessary to accommodate the Contractor's <br /> operations or traffic conditions shall be incidental. <br /> 00490.40 General <br /> (ADD) Manholes, sumps, inlets, valve boxes and other structures shall not protrude <br /> more than 2 inches above adjacent surtaces open to traffic. Lower as required. <br /> When manholes, sumps, inlets, valve boxes and other structures protrude more <br /> than 1 inch, but less than or equal to 2 inches, above adjacent surfaces open to <br /> traffic, place temporary HMAC transitions around the structures. <br /> 00490.48 Adjusting Boxes, Cieanout Lids and Similar Structures <br /> (ADD) Adjust water valve boxes. in accordance with EWEB specifications attached. <br /> <br /> Special Provisions -Job #4317 Page 2 of 26 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.