Proposal Cost Breakdown Supplementa! Sheet <br /> Cumulqtive <br /> Quantity Units Rate Subtotals Total <br />03 Hilyard Street from East Boradway to East 13th Avenue 1544 feet Cores 3 <br />On Sire FWD tesring anAforing fWD 31 <br />FWD Unit (includes staff engineer) 0.40 each S 1,500.00 S 600.00 <br />Staff Engineerlli(corelogginq) 5.00 hours S 103.00 S 515.00 <br />Flagging Subcontractor p~cludes 12fG markup) 1.60 each S 750.00 S 1,200.00 <br />Orilling Subcontractor (includes 12X markup) O.6U each S 1,250.00 1 750.00 <br />Data Reduction and Anqlysis • <br />Project Engineer il 5.50 hours S 121.00 S 665.50 <br />Laboraiory Tesiing <br />Moisture Content 4.00 each S 12.00 S 48.00 <br />Wash Sieve Analysis ~ 1.00 each S 80.00 S 80.00 <br />Atterberg Limits each f 105.00 S - <br />Report Preparation <br />Printipal Engineer (review) 1.50 hour S 159.00 S 238.50 <br />ProJect £ngineer II 6.50 hours S 121.00 S 786.50 <br />Drafting 3.00 hours S 83.00 S 249.00 <br />Project Assistant . 3.00 hours f 72.00 S 216.00 <br />Support Staff 1.50 hours 1 55.00 S 82.50 <br /> Subtotal S 5,43I.00 S 28,352.00 <br />04 Lincoin Street from West 23rd to West 30th Avenue 3644 feet Cores 6 <br />On Sitt fWD testing ond Coring Fyyp 73 <br />FwD Unic (iacludes staff engineer) 0.65 each S 1,500.00 S 975.00 <br />Staff Engineer III (core logging) 9.00 hours S 103.00 S 927.00 <br />Flagging Subcontractor (includes 12%markup) 2.00 each S 750.00 S 1,500.00 <br />Orilling Subcontrectortfncludes 12%markup) 1.20 each S 1,250.00 f 1,500.00 <br />Data ReQutiion and Analysis <br />Project Engineer II 8.50 hours f 121.00 S 1,028.50 <br />Laboratory Testing <br />Moisture Content 8.00 each S 12.00 S 96.~0 <br />Wash SEeve Analysis 2.00 each S 80.00 S 160.00 <br />Aiterberg Limits 1.00 each S 105.00 S 305.00 <br />Report Preparotion <br />Prlncipal Engineer (review} 2.00 hour S 159.00 S 318.00 <br />Project Engineer II 9_00 hours S 121.00 S 1,089.00 <br />Drafting 4.00 hours S 83.00 S 332.00 <br />Project Assistant 4.00 hours S 72.00 S 288.00 <br />Support Staff 2.00 hours S 55.00 S 110.00 <br /> Subtotal S 8,428.50 S 36,780.50 <br />OS East 33rd Avenue from Hilyard Street to Willamette Streec 2678 feec Cores 4 <br />On SJte FWD testing and Caring FlND 54 <br />FWD Unit (includes staff engineer) 0.50 each S 1,500.00 S 750.00 <br />Staff Engineer III (core logging) 6.00 hours t 103.00 S 618.00 <br />Flaggi~g Subcant~actor (1a<ludes 12% markup) 1.70 each S 75Q.00 S 1,275.00 <br />Drifling Subcontractor(includes 12%markup) 0.80 each S 1,250.00 S I,OOQ.00 <br />Data ReAuttion and Analysis <br />ProJect Engineer II 7.00 hours S 121.00 S 847.00 <br />Laboratory Testing <br />Moisture Content 7.00 eaCh S 12.00 S 84.00 <br />Wash Sieve Analysis 1.00 each S 80.00 S 80.00 <br />Atterberg limits 1.00 each S 105.00 S 105.00 <br />Report Preparation <br />Princtpa! Engineer (review) 1.50 hour S 159.00 S 238.50 <br />Project Engineer it 7.50 hours S 121.00 1 907.50 <br />Drafting 3.50 hours S 83.00 S 290.50 <br />Project Assistant 3.50 hours S 72.00 S 252.00 <br />Support Staff 1.50 hours 1 55.00 S 82.50 <br />5ubtota( S 6,530.00 S 43,310.50 <br />~DES (G N? Aitachment Eugene-7-0t:051606 <br />