New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4466 GeoDesign Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4466 GeoDesign Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2011 9:20:07 AM
Creation date
6/11/2008 2:32:10 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004466
GL_Project_Number
975614
COE_Contract_Number
2008-00210
Retention_Destruction_Date
2/14/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Proposal Cost 8reakdown Supplemental5heet <br /> Cumuladve <br /> Quantity Uxits Rate Swbtotafs Total <br />Project Maoagement . <br />ProJect Engineer 11 12 hours 1 I21.00 S 1,452.00 <br />Mffeage 150 miles S 0.60 S 90.00 <br />Per Diem 1 days S 125.00 1 125.00 <br /> S 1,667.00 S 1,667.00 <br />Oistress Survey for Alt Roads <br />Project Engineer I( 14 hours 3 121.00 S 1,694.00 <br />Milea9e 300 miles S 0.60 S 180.00 <br /> S 1,874.00 S 3,541.00 <br />RND Mobilizatioa and Per Diern <br />Staff Engineer 111 6 hou~s S 103.00 S 618.00 <br />Mileage 300 miles S 0.60 S 18a.00 <br />Per Diem 3.5 days S 125.00 1 437.50 <br /> <br />Coring Mobilization and Per Diem S 1,235.50 S 4,776.SU <br />Staff Engineer III 6 hours S I03.00 S 618.00 <br />Mileage 300 miles S 0.60 S 180.00 <br />Per Diem 6 days S 125.00 S 750.00 <br /> S 1,548,00 f 6,324.50 <br />Ol Ciry Vlew Street from Wesc 18th Avenue to West 28th Avenue 3922 feet Cores 8 <br />On ~Site FWO testing an4 Coring ~ ~$ <br />F1N0 Unit pncludes staff engineer) 0.65 each S 1,500.00 S 975.00 <br />Staff Engfoeer ill (core loggi~g) 11.00 hours S 103.00 S 1,133.00 <br />Flagging Subcontraaor (Includes 1276 markup) 2.00 each S 750.00 S 1,500.00 <br />Orilfing Subcontractor(includes 12%markup) <br />~ 1.30 each S 1,250.00 S 1,625.00 <br />Data Reduction and Analysis <br />Pro}ect fngineer II 9.00 hours S 121.00 S 1,089.00 <br />Labora[ory Testing <br />Moisture Contertt 9,00 each S 12.00 S 108.00 <br />Wash Sieve Analysis 2.00 each S 80.00 S 160.00 <br />Atterberg limits 2.00 each S 305.00 S Z10.00 <br />Report Preparation <br />Principat Engineer (review) 2.00 hour S 159.00 S 318.00 <br />Project Engineer II 9.50 hours S 121.00 S 1,149.50 <br />Drafting 4.50 hours S 83.00 S 373.50 <br />ProjeCt Assistant 4.50 hours S 72.00 S 324.00 <br />Support Staff 2.00 hours S 55.00 S 110.00 <br /> Subtotal S 9,075.00 S 15,399.50 <br />02 High Street from East 3~d Avenue to East llth Avenue 3066 feet Cores 5 <br />On Slit fW0 testing and Coring FWp 61 <br />fWD Unit (inciudes staff engineeh 0.50 each S 1,500.00 S 750.00 <br />Staff Engineer III (core bqging) 8.00 hours S 103.00 S 824.00 <br />Flagging Subcontractor (includes 1296 markup) 1.90 each S 750_00 S 1.425.00 <br />Drilling Subcontractor (inciudes 1296 markup) 1.00 each S 1,250.00 S 2,250.00 <br />Data ReAuction aru! Analysis <br />~Project Engineer II 7.50 hours S 121.00 S 907.50 <br />Laborafory Testing <br />Motsture Content 7.00 each f 12.00 1 84.00 <br />Wash Sieve Analysis 2.00 each S 80.00 S 160.00 <br />Atterberg Limits 1.00 each S 105.00 f 105.00 <br />Report Preparatlon <br />Principai Engineer (review) 2.00 hour S 159.00 S 318.00 <br />ProJect Engineer II 8.00 hours S 121.00 S 968.00 <br />Drafting 4.00 hours S 83.00 f 332.00 <br />ProJect Assfsiant 4.00 hours S 72.00 S 288.00 <br />Support StaH 2.00 hours S 55.00 S 110.Od <br /> Subtotal S 7,521.50 S 22,921.00 <br />C~DESIGN? Attachment Euqene-7-01:051606 <br />
The URL can be used to link to this page
Your browser does not support the video tag.