<br />Proposat Cost Breakdown Supplemental Sheet <br /> <br />~ <br />Quantif <br />Unlts <br />R <br />t <br />S <br />b <br />/ Curwulative <br /> <br />06 East 13th Avenue Klncaid Streetto AlderStreet y <br />442 feet a <br />e <br />Cores tota <br />u <br />s <br />2 Total <br /> On Sitt FWD testing and Coring FWD 18 <br /> F1V0 Unit 6ncludes staff engineer) 0.25 each S 1,500.00 S 375.00 <br /> Staff Engineer Itl (tore logging) 3.00 hours S 103.00 S 309.00 <br /> Ftagging Subcontractor (includes 12%markup} 1.20 each S 750.00 S 900.00 <br /> Drilling Subcontractor (includes 12% markup) 0.30 each S 1,250.04 S 375.00 <br /> Da[a Reduciion anQAnalysis <br /> Project Engineer 11 4.00 hours S 121.00 S a84.00 <br /> Laboratory Testing <br /> Moisture Content 2.00 each S 12.00 f 24.00 <br /> Wash Sieve Analysis 1.00 each S 80.00 S 80.00 <br /> Atterberg l.imits 0.00 each S 105.00 f - <br /> Reporc Preparation <br /> Principa! Engineer (review) 1.00 hour S 159.00 S 159.00 <br /> ProJect Engineer II 4.50 hours S 121.00 S 544_SO <br /> Drafting 2.00 hours S 83.00 S 166.00 <br /> Project Assistant 2.50 hours S 72.00 S 180.00 <br /> Support Staff 1.00 hours S SS.00 S SS.00 <br /> Subtotal S 3,651.50 S 46,962.00 <br /> 07 Alder Street from East 13tfi to East i8th Avenue 1953 feet Cwes 3 <br /> On Site fWD terting and Cori»g FWO 52 <br /> FWD Unit (includes siaft engineer) 0.40 each 1 1,500.00 S 600.00 <br /> Staff Engi~eer Itl (core kgging) 5.50 hours S 103.00 S 566.50 <br /> Flagging Subcontractor (indudes 1296 markup) 1.70 each S 750.00 S 1,275.00 <br /> Orilling Subco~tractor (includes 129G markup) 0.60 each S 1,250.00 S 750.00 <br /> Data Reduction and Analysis <br /> Project En9ineer II 6.00 hours S 121.00 S 726.00 <br /> Loboratory Tisting <br /> Moisture Content 5.00 ea<h f 12.00 S 60.00 <br />~ Wash Skve Analysis <br />Atterberq Umits 1.Oa each <br />1.00 each S 80.00 <br />S 105.00 f <br />S 80.00 <br />105.00 <br /> Reyort Preparadon <br /> Principat Engineer (reWew) 1.50 hour S 159.00 S 238.50 <br /> Project Engineer II 6.50 hours S 121.00 S 786.50 <br /> O~afting 3.50 hours S 83.00 S 290.50 <br /> ProJect Assistant 3.00 hours 1 72.U0 S 216.00 <br /> Suppon Staff I.50 hours S 55.00 S 82.50 <br /> Subtotai S 5.776.50 S 52,738.50 <br /> 08 Consulcing Engineering Services for Design and Review of Potent)al Cold in Place Recycling on Roosevelt Boulevard <br /> Site Visit and Construcrkn Monltoring <br />_ Project Engineer il 20.00 hours S 121.00 S 2,420.00 <br /> Data Reduc[lon anQ Analysis, Researching • <br /> Project Engineer 11 14.00 hours S 122.00 S 1,694.00 <br /> Reyori preparation <br /> Prl~clpal Engineer(review} 1.50 hour S 159.00 S 238.50 <br /> vroJect Enginee~ II 6.00 hours S 121.00 S 726.00 <br /> Project Assistant 2.00 hours S 72.00 S 144.00 <br /> Support StaN 1.50 hours S SS.00 S 82.50 <br /> Subtotal 1 5,305.00 S 58,043.50 <br />~DESIGN3 Attachmcnt Eu9e~e-7-O1:OS3606 <br />