New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Amazon Channel - Storm Sewer
COE
>
PW
>
POS_PWM
>
Parks
>
Stormwater
>
Amazon Channel - Storm Sewer
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2015 11:12:53 AM
Creation date
9/11/2015 11:12:06 AM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
Fiscal_Year
2016
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> AMAZON CREEK CHANNEL IMPROVEMENT - PROJECT NO. 15-01 (Continued) <br /> 8. GENERAL RECOMMENDED MAINTENANCE: The maintenance item listed <br /> below currently does not impact the structural integrity of the <br /> project but is recommended to prevent major repairs in the <br /> future. - <br /> a. Remove encroachments within the project right-of-way <br /> which limit access for maintenance operations and during times of <br /> flooding.. Ensure encroachments are coordinated with the City and <br /> the Planning& Engineering Division of the Corps of Engineers, <br /> Portland District. <br /> 9. CONCLUSION AND RATING: .. Overall, the Amazon Creek Channel <br /> Improvement project is in good condition. The maintenance <br /> program is well executed. The inspection found the general <br /> maintenance of the flood control works to be acceptable. ' <br /> ohn Todd, P.E. <br /> Civil Engineer <br /> • • <br /> • <br /> . <br />
The URL can be used to link to this page
Your browser does not support the video tag.