• <br /> • <br /> AMAZON CREEK CHANNEL IMPROVEMENT - PROJECT NO. 15-01 (Continued) <br /> d. Berry vines were noted on the right bank of the channel <br /> side slope downstream of the fairgrounds and extending to Polk <br /> Street (approx. 200 feet in length) . The vines restrict <br /> inspection of the channel and create habitat for burrowing <br /> animals. <br /> e. Sediment deposition in the channel was noted at the <br /> following locations: upstream of Oak Patch Road (approx. 100 <br /> feet in length) ; and upstream of Belt Line Road (approx. 300 feet <br /> in length) . <br /> f. Encroachments on the right-of-way were noted at the <br /> following locations: scrap steel is stored along sections of the <br /> shoulder (right bank) upstream of Oak Patch Road; a fence is <br /> located along the shoulder (right bank) at the county <br /> fairgrounds; and several mobile homes (left bank) are located <br /> near the shoulder of the channel immediately upstream of Danebo <br /> Road. Though these encroachments do not impact the integrity of <br /> the project, they will limit access for construction equipment in <br /> - these areas during maintenance operations and will restrict <br /> construction operations during times of flooding. <br /> 6. RESOLUTION OF PERMITS: None. <br /> 7 . REQUIRED MAINTENANCE TO ENSURE PROJECT INTEGRITY: Listed in <br /> order of priority are the following maintenance items that should <br /> be corrected prior to the next inspection: <br /> LOCATION REQUIRED MAINTENANCE ESTIMATED QUANTITIES <br /> Various Repair channel slide approx. 470LF <br /> slope <br /> Channel between Selective mowing, and 0. 5 acre <br /> 26th and 33rd clearing of trees and <br /> Avenues brush in channel <br /> Various Remove sediment from approx. 200 cubic yds <br /> channel <br /> (RB) between Remove berry vines 0. 1 acre <br /> Fairgrounds and from channel side <br /> Polk St._. slope <br />