New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Amazon Channel - Storm Sewer
COE
>
PW
>
POS_PWM
>
Parks
>
Stormwater
>
Amazon Channel - Storm Sewer
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2015 11:12:53 AM
Creation date
9/11/2015 11:12:06 AM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
Fiscal_Year
2016
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> AMAZON CREEK CHANNEL IMPROVEMENT - PROJECT NO. 15-01 Continued) <br /> d. Encroachments on the right-of-way were noted at the <br /> following locations: scrap steel is stored along sections of the <br /> shoulder (right bank) upstream of Oak Patch Street; a fence is <br /> located along the shoulder (right bank) at the county fairgrounds; <br /> and materials are stored along the shoulder (left bank) immediately <br /> downstream of Bailey Hill Road. Though these encroachments do not <br /> impact the integrity of the project, they will limit access for <br /> construction equipment in these areas during maintenance operations <br /> and will restrict construction operations during times of flooding. <br /> 6. RESOLUTION OF PERMITS: None. <br /> 7. REIUIRED MAINTENANCE TO ENSURE PROJECT INTEGRITY: Listed in <br /> order of priority are the following maintenance items that should <br /> be corrected prior to the next inspection: <br /> LOCATION REQUIRED MAINTENANCE <br /> ESTIMATED QUANTITIES <br /> Various Repair channel slide <br /> approx. 400 LF <br /> areas <br /> (RB) between Remove berry vines <br /> Jefferson St. from channel side 1- 5 acres <br /> Bridge and Polk slope <br /> St. <br /> 8 . GENERAL RECOMMENDED MAINTENANCE: The maintenance item listed <br /> below currently does not impact the structural integrity of the <br /> project but is recommended to prevent major repairs in the future. <br /> a. Remove encroachments within the project right-of-way which <br /> limit access for maintenance operations and during times of <br /> flooding. Ensure encroachments are coordinated with the City and <br /> the Planning & Engineering Division of the Corps of Engineers, <br /> Portland District. <br /> 9. CONCLUSION AND RATING: Overall, the Amazon Creek Channel <br /> Improvement project is in good condition. The maintenance program <br /> is well executed. The inspection found the general maintenance of <br /> the flood control works to be acceptable. <br /> • <br /> John Todd, P. E. <br /> Civil Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.