New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Tugman Park, Landfill and Creek
COE
>
PW
>
POS_PWM
>
Parks
>
Specific Parks
>
Tugman Park, Landfill and Creek
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2015 1:30:34 PM
Creation date
8/24/2015 1:30:26 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
Fiscal_Year
2016
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
JENNINGS Carrie A <br /> From: JENNINGS Carrie A <br /> To: LYLE Les A; SHUTT Gene; MORGAN Dick A; CAHILL Michelle R; LONG Jack E; <br /> MEDLIN Johnny R; ETTER John F; SOLIN Chuck R; RITTER Dave P; MCVEY Fred <br /> Subject: Tugman Creek Project <br /> Date: Thursday, June 15, 1995 12:38PM <br /> FROM: Bob Hammitt <br /> Thanks to all of you for your input into the Tugman Creek project. Based on that input, and a tour of the <br /> creek area earlier this week by Gene Shutt and myself, I have established the following plan. <br /> Much of the creek cross section is hidden by tall grass, and in a few areas, other overgrowth such as <br /> blackberries. This makes it very difficult to inspect the creek channel for any blockages or narrow spots <br /> that might cause flooding to occur during heavy rains. When the area is dry enough (probably near August <br /> 1st) Tim Rhay will rough mow the banks and the other safely accessible points in the channel. Dick <br /> Morgan will then contract with the Lane County Sheriff's work crew or the Lane County Juvenile Services <br /> work crew to perform removal of vegetation within the creek channel not accessible to the rough mower. <br /> Thus, the creek bottom can be inspected and the crew will also be instructed to hand remove any <br /> obstructions or blockages located. This will allow us to make visual inspections of the creek during the <br /> next rainy season to determine the appropriate solution and repairs needed to contain the water within the <br /> creek bed. <br /> The goal of this project is to minimize the amount of work we perform with mechanical equipment in order <br /> to preserve the natural setting as much as possible. <br /> If you have any questions or concerns regarding this project, please contact me. <br /> Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.